![Big Backyard F23475 Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/big-backyard/f23475/f23475_installation-and-operating-instructions-manual_2749857029.webp)
STEP 14
Attach Floor Boards
2X D2
D1
2X
CE Floor Board 1 x 5 x 51"
CE Gap Board 1 x 4 x 51"
9X
Wood Parts
D2
CE Gap Board 1 x 6 x 51"
7X
7 per
Wood Screw #8 x 1½"
B4
S2
122X
Hardware
D3
CE Gap Board 1 x 4 x 38¾"
D3
7 per
6 per
D1
1 per floor
board centered
into Joist
A
: Starting at Swing Wall side, layout 1
(D1)
CE Gap Board with a 5/8" space
beside
(B4)
, followed by 7
(D3)
CE Gap
Boards, then 2
(D2)
CE Floor Boards
and 1
(D1)
CE Gap Board and lastly 9
(B4)
CE Gap Boards.
B
: Make sure all boards are evenly
spaced.
C
: Attach boards using
(S2)
#8 x 1½”
wood screws, 6 per
(D1)
CE Gap Board,
7 per
(D3)
CE Gap Board and
(D2)
CE
Floor Board, 5 per
(B4)
CE Gap Board
& 1 in each of the previously attached
(B4)
&
(B5)
CE Gap Boards.
B4
S2
S2
B4
S2
D1
S2
5 per
D1
D2
D3
S2
B4
B5
Allow 5/8"
space here
29
Содержание F23475
Страница 58: ...NOTES 58...
Страница 59: ...NOTES 59...