-Add Rock Boards
B
Do not attach last
board until later step
B1
B3
B2
Finish at this end.
STEP 1
Rock Wall Assembly
Start at this end
A
-Build Rails
C5
B14
S7
8X
Wood Screw #8 x 1½"
48X
B3
5X
S2
Rock Board A 1 x 6 x 23½"
B2
1X
CE Wall Board 1 x 6 x 23½"
B1
2X
Rock Rail 5/4 x 4 x 71"
B14
2X
Rock Side 2 x 2 x 69"
Hardware
Wood Parts
Pan Screw #12 x 2"
Rock Board B 1 x 6 x 23½"
11X Rocks w/ Hardware
C5
6X
S7
(4 per board)
x48
S2
Flat Washer
Pan Bolt
Lock Washer
Pan Screw
(Fasten directly below Pan Bolt)
-Add Rocks
C
A
: Fasten 1
(C5)
Rock Side to each
(B14)
Rock Rail using 4
(S7)
#12 x 2” pan screws
per board.
B
: Start at the end shown below and lay out
the
(B1)
CE Wall Board and then each
(B2)
Rock Board A and
(B3)
Rock Board B,
staggering boards so the rock boards do not
form a straight line. Continue step B below.
C
: Attach 1 rock to each rock board using the hardware provided in the rock bag. Each rock
must be installed with the pan bolt, flat washer, lock washer and barrel nut as well as the pan
screw. The pan screw is to be installed directly under the pan bolt to prevent the rock from spinning.
B
: Make sure the boards are tight to each other and
attach with 4
(S2)
#8 x 1½” wood screws per board.
17
Содержание F23475
Страница 58: ...NOTES 58...
Страница 59: ...NOTES 59...