S2
Hardware
2X
8X
Wood Screw #8 x 1½"
(S2)
Wood Parts
B1
Rock Wall Ground to the Rock Wall
1X
1X
using 2
CE Wall Board 1 x 6 x 23½"
Pan Screw #12 x 2"
(E19)
Rock Wall Ground 1 x 6 x 38"
#8 x 1½” wood screws.
S7
Move Fort to final location
A
: In the opening next to the picnic table, attach the Rock
Wall to the
(B19)
Front Floor using 1
(S7)
#12 x 2” pan
screw in each outside hole and 1
(S2)
#8 x 1½” wood
screw in each inside hole as shown below.
B
: Attach 1
(B1)
CE Wall Board to the top of the Rock
Wall using 4
(S2)
#8 x 1½” wood screws. Make sure that
(B1)
is tight against the top rock board.
C
: Attach
(E19)
Rock Wall Ground to
(C8)
Ground Front
Back using 2 Corner Braces with hardware.
D
: Attach
E19
1X Corner Brace
w/ hardware (pkg of 2)
Note: 1 Corner Brace on each side of
(E19)
S2
S7
S7
B19
E19
S2
B1
S2
X4
C8
Corner
Brace
X2
STEP 26
Attach Rock Wall
41
Содержание F23475
Страница 58: ...NOTES 58...
Страница 59: ...NOTES 59...