49
A:
Tight to the top of (2123) Back Floor and flush to the outside edge of (2112) SL Post attach (2151) Back Wall
Support to (2112) SL Post and (2153) Post with 4 (S7) #12 x 2” Pan Screws. (fig. 17.1 and 17.2)
B:
Flush to the outside edge of (2151) Back Wall Support and tight to the floor boards attach (1205) CE Access
Wall to (2151) Back Wall Support, (2143) Middle Back and (2145) Back Top with 5 (S1) #8 x 1-1/8” Wood Screws,
as shown in fig 17.2 and 17.4.
C:
Evenly space and attach 4 (5265) Cedar Walls to (2151) Back Wall Support and (2143) Middle Back with 4
(S1) #8 x 1-1/8” Wood Screws, as shown in fig 17.1, 17.2, 17.3 and 17.4. Make sure the bottom of the boards
are tight against the floor boards and the bevelled ends are at the top and facing out.
Step 17: Upper Back Wall Assembly
Hardware
Wood Parts
4 x
Cedar Wall 1 x 4 x 28”
1 x
CE Access Wall 1 x 4 x 41-3/4”
1 x
Back Wall Support 5/4 x 4 x 31”
5265
21 x
#8 x 1-1/8” Wood Screw
4 x
#12 x 2” Pan Screw
S1
Fig. 17.2
Back Wall
x 4
Fig. 17.1
Fig. 17.3
Fig. 17.4
S7
Outside View
Back Wall
Outside View
Inside View
2112
2151
Flush
2153
Flush
2123
2145
2153
2143
2112
2151
1205
5265
S1
x 5
1205
Inside
View
S7
S1
x 4 per
board
2151
Содержание ASHBERRY II F23073C
Страница 3: ...3 support solowavedesign com ...
Страница 4: ...4 support solowavedesign com ...
Страница 5: ...5 support solowavedesign com ...
Страница 76: ...76 support solowavedesign com NOTES ...
Страница 77: ...77 support solowavedesign com NOTES ...
Страница 78: ...78 support solowavedesign com NOTES ...
Страница 79: ...79 support solowavedesign com NOTES ...