62
2 x
1/4 x 1-1/2” Lag Screw (1/4”flat washer)
2 x
1/4 x 1” Hex Bolt (1/4” lock washer, 1/4” flat washer, 1/4” t-nut)
4 x
#8 x 1-1/8” Wood Screw
Hardware
Wood Parts
Other Parts
Step 25: Attach Hand Grips and Wall Board to Fort
Pre-drill all holes using a 3/16” drill bit before installing the Lag Screws
A:
Measure 6-1/2” up from the floor boards on (2153) Post then attach 1 Hand Grip with 2 (LS1) 1/4 x 1-1/2” Lag
Screws (with flat washer). (fig. 25.1 and 25.2)
B:
Attach a second Hand Grip to (1205) CE Access Wall using the bolt holes, with 2 (H0) 1/4 x 1” Hex Bolt (with
lock washer, flat washer and t-nut). (fig. 25.2)
C:
Flush to the bottom of (2125) Middle Front and centred between the arches of (2145) Back Top, as shown
in fig. 25.1, attach (0850) CE Wall Board with 4 (S1) #8 x 1-1/8” Wood Screws. Bevelled edge faces down and
towards inside of fort. (fig. 25.2 and 25.3)
LS1
2 x Hand Grips
Fig. 25.2
1/4” flat
washer
1/4”
t-nut
1/4” flat
washer
Fig. 25.1
Fig. 25.3
H0
1/4” lock
washer
LS1
x 2
6-1/2”
S1
x 4
Flush
2125
Hand
Grip
1205
0850
2153
2125
View from inside
2145
H0
1 x
CE Wall Board 1 x 4 x 17”
0850
Arches
2145
Hand Grip
S1
Bevelled edge
facing down and
towards inside of
fort
0850
Содержание ASHBERRY II F23073C
Страница 3: ...3 support solowavedesign com ...
Страница 4: ...4 support solowavedesign com ...
Страница 5: ...5 support solowavedesign com ...
Страница 76: ...76 support solowavedesign com NOTES ...
Страница 77: ...77 support solowavedesign com NOTES ...
Страница 78: ...78 support solowavedesign com NOTES ...
Страница 79: ...79 support solowavedesign com NOTES ...