15
ENGLISH
5 COMMISSIONING
5.1 Preliminary checks
First ignition is carried out by competent personnel from an authorised
Technical Assistance Service Beretta.
Before starting up the boiler, check:
- that the data of the supply networks (electricity, water, gas) correspond
to the label data
-
that the extraction pipes of the flue gases and the air suction pipes are
working correctly
- that conditions for regular maintenance are guaranteed if the boiler is
placed inside or between items of furniture
- the seal of the fuel adduction system
-
that the fuel flow rate corresponds to values required by the boiler
-
that the fuel supply system is sized to provide the correct flow rate to
the boiler, and that it has all the safety and control devices required by
current regulations
- that the circulator rotates freely because, especially after long periods of
inactivity, deposits and/or debris can prevent free rotation.
Eventual releasing of the circulator shaft
- Insert a screwdriver in the hole (
1
) of the circulator.
- Press (
a
) and turn the n° 2 Phillips screwdriver (
b
) until the release of
the crankshaft.
Perform this operation with extreme caution to avoid damaging the
components.
a
b
1
5.2 Programming the boiler
- Position the system’s master switch
to the “on” position
.
-
If necessary set the TIME and DATE setting the HOURS, MINUTES,
DAY, MONTH and YEAR with the keys
“up”
and
“down”
, confirming
the selection.
-
12
17
:
ENTER TIME AND DATE
TIME & DATE
USE THE ARROWS TO MODIFY
18 / 11 / 2013
ENTER TIME AND DATE
TIME & DATE
USE THE ARROWS TO MODIFY
Note: it is possible to change the
TIME & DATE
settings, as well as
LANGUAGE and the duration of the back-lighting, also later by entering
the MENU from the main screen and then selecting SETTINGS
.
b
Each time that the boiler is powered an automatic venting cycle is
carried out lasting 4 min. To interrupt the vent cycle, carry out the
procedure explained in the section
.
-
Set the boiler to OFF from REC10 selecting the STATE menu and
then BOILER
.
4.1 Access to the technical parameters
Through the REC10 it is possible to access, using the TECHNICAL menu,
a series of parameters that can be programmed to allow you to personalise
the operation of the boiler:
- select MENU on the initial page of the REC10 and press the key
18/05/2013
12:17
INFO
SET
30
°C
.3
MENU
FRI
STATE
PLANT
HOT WATER TEMPERATURE
1.3 bar
MENU
STATE
SET
INFO
PLANT
HOT WATER TEMPERATURE
FRI
- keep the keys
and
pressed at the same time to enter the
password menu (about 5 sec)
18/11/2013
12:17
FRI
SETTINGS
MENU
SELECT OPTION
MENU
SETTINGS
SELECT OPTION
FRI
- using the keys
and
select the value of the password to
access the INSTALLER or SERVICE authorisation level, depending on
the level of the tree menu, then press the key
00
INSERT PASSWORD
INSERT PASSWORD
-
select TECHNICAL with the keys
and
, confirming the
selection with the key
SETTINGS
TECHNICAL
SELECT OPTION
MENU
SELECT OPTION
SETTINGS
TECHNICAL
MENU
- access the desired menu and change/view the parameter concerned
(see the menu tree on page 11).
It is possible to return to the start page at any time by keeping the key
“back”
pressed for at least 2 seconds.