LR-10000 Low-Rise Scissor Lift
26
P/N 5900075 — Rev. A1 — April 2019
To connect to a Power Source and add Hydraulic Fluid
:
1.
Have the Electrician locate the Pigtail coming out of the Electrical Box on the Power Unit.
2.
Open the Electrical Box, remove the Pigtail, and then wire a Power Cord (with an appropriate Plug)
inside the Electrical Box
to the wiring that was connected to the Pigtail.
The Electrician needs to provide the Power Cord and Plug; these are
not
supplied with the Lift.
Refer to
⚠
DANGER
All wiring
must
be performed by a licensed, certified Electrician. Do not perform
any
maintenance or installation on the lift without first making sure that main
electrical power has been disconnected from the lift and
cannot
be re-energized
until all procedures are complete.
Important electrical information:
•
Improper elec
trical installation can damage the Power Unit motor; this damage is not covered by
the warranty.
•
If you have multiple Power Units, use a separate circuit breaker for each Power Unit.
•
Protect each circuit with a time-del
ay fuse or circuit breaker. For a 115 VAC, 1 phase circuit, use
a 15 amp or greater fuse. For a 230 VAC, 1 phase circuit, use a 25 amp or greater fuse.
3.
Fill the Hydraulic Fluid reservoir.
The Power Unit’s Hydraulic Fluid reservoir must be filled with Hydraulic Fluid or automatic
transmission fluid
before
you begin operation. When you receive it, the reservoir is empty; the
Power Unit will not work correctly until it is filled with approved fluids.
Approved Hydraulic Fluids are any general purpose ISO-32, ISO-46, or ISO-68 hydraulic oil or
approved automatic transmission fluids such as Dexron III, Dexron VI, Mercon V, Mercon LV, Shell
Tellus S4 / S3 / S2, or any synthetic multi-Vehicle automatic transmission fluid.
⚠
WARNING
Do not run your Power Unit without Hydraulic Fluid; you will damage it.
Install a Power Disconnect Switch
⚠
WARNING
A Power Disconnect Switch is
not
provided with this equipment.
A Power Disconnect Switch is a National Electrical Code (NEC) requirement. They are designed to
interrupt main electrical power in the event of an electrical circuit fault, emergency situation, or when
equipment is undergoing service or maintenance.
Make sure to install a Power Disconnect Switch that is properly rated for the incoming power source.
Your Power Disconnect Switch must be installed so that it is in
easy reach of the Operator
or in
their line of sight. The Power Disconnect Switch must be
clearly marked
to indicate its purpose.
If you are not clear where to put the Power Disconnect Switch, consult with your Electrician.
⚠
DANGER
Installing a Thermal Disconnect Switch
must
be performed by a licensed, certified
Electrician.
Have your Electrician select a
UL-listed
Power Disconnect Switch.
Содержание LR-10000
Страница 8: ...LR 10000 Low Rise Scissor Lift 8 P N 5900075 Rev A1 April 2019 Specifications ...
Страница 37: ...LR 10000 Low Rise Scissor Lift 37 P N 5900075 Rev A1 April 2019 Labels ...
Страница 38: ...LR 10000 Low Rise Scissor Lift 38 P N 5900075 Rev A1 April 2019 ...
Страница 39: ...LR 10000 Low Rise Scissor Lift 39 P N 5900075 Rev A1 April 2019 Parts Diagrams ...
Страница 40: ...LR 10000 Low Rise Scissor Lift 40 P N 5900075 Rev A1 April 2019 ...
Страница 41: ...LR 10000 Low Rise Scissor Lift 41 P N 5900075 Rev A1 April 2019 ...
Страница 43: ...LR 10000 Low Rise Scissor Lift 43 P N 5900075 Rev A1 April 2019 Maintenance Log ...
Страница 44: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2019 by BendPak Inc All rights reserved bendpak com ...