LR-10000 Low-Rise Scissor Lift
15
P/N 5900075 — Rev. A1 — April 2019
Make the Alignment Chalk Line longer than the
Overall width
of the LR-10000.
Refer to
3.
Create two Side Chalk Lines, one on each side of the Lift.
These Side Chalk Lines both need to be at 90 degree angles to the Alignment Chalk Line and
parallel to each other.
Make the Side Chalk Lines longer than the
Overall length
of the Lift.
Refer to
4.
Move the Lift into position: one end just inside the Alignment Chalk Line and the two sides just
inside the two Side Chalk Lines.
5.
When the Platforms are in the correct location, they can be anchored into place.
Tip
Before anchoring the Lift, check to make sure there is an appropriate location for
the Power Unit Stand: close to a power source and within reach of the Hydraulic
Lines provided with the Lift.
Содержание LR-10000
Страница 8: ...LR 10000 Low Rise Scissor Lift 8 P N 5900075 Rev A1 April 2019 Specifications ...
Страница 37: ...LR 10000 Low Rise Scissor Lift 37 P N 5900075 Rev A1 April 2019 Labels ...
Страница 38: ...LR 10000 Low Rise Scissor Lift 38 P N 5900075 Rev A1 April 2019 ...
Страница 39: ...LR 10000 Low Rise Scissor Lift 39 P N 5900075 Rev A1 April 2019 Parts Diagrams ...
Страница 40: ...LR 10000 Low Rise Scissor Lift 40 P N 5900075 Rev A1 April 2019 ...
Страница 41: ...LR 10000 Low Rise Scissor Lift 41 P N 5900075 Rev A1 April 2019 ...
Страница 43: ...LR 10000 Low Rise Scissor Lift 43 P N 5900075 Rev A1 April 2019 Maintenance Log ...
Страница 44: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2019 by BendPak Inc All rights reserved bendpak com ...