Donut Robot Mark VI Technical Supplement
Leveling and Securing the
Fryer
Check to see if the fryer is level. If it is not,
adjust the heights of the legs. Be sure that all six
legs rest on the work surface when the fryer is
level.
Bolt the fryer to the work surface as follows:
1. There are brackets on the ends of the fryer
case. Each has a hole in it. Mark the
locations of the holes on the work surface.
2. Drill holes through the work surface.
3. Insert bolts through the holes.
4. Tighten nuts onto the bolts to ensure that the
Donut Robot will not move.
Moving the Fryer
If you ever want to move the fryer to a different
workstation, follow this procedure:
1. Turn off the machine and disconnect it from
the power source. Unplug the depositor
power cord.
2. Allow the machine and the shortening to
cool.
WARNING
Do not touch hot shortening. It can cause
serious burns.
3. Remove and set aside the plunger, the
hopper, and the cutter head, in that order.
4. Disconnect the swing connecting rod.
5. Remove the shortening from the fryer as
explained in “Removing the Shortening” in
Section 3.
6. To avoid dropping the machine or getting
shortening on the floor wipe excess
shortening off of the fryer and the conveyor.
WARNING
Thoroughly clean and dry the floor if
shortening is spilled. Materials on the
floor can cause people to slip or fall,
resulting in serious injury or loss of life.
7. Set aside the conveyor.
8. Remove the clevis pins that hold the heater
head in place. Remove the heater head from
the fryer.
9. To prevent tripping, coil the power cord.
Move the heater head to the new
workstation.
10. Move the fryer to its new location.
11. Install the heater head.
12. Move and install the conveyor.
13 Move and install the swing column.
Connect the swing connecting rod.
14. Move and install the depositor’s cutter head
(the motor and electrical compartment).
15. Move and install the hopper and the plunger.
16. Level and secure the fryer.