BELARUS-
1523/1523В
/1523.3
/1523В.3
Drive Controls and Instrumentation
54
Controls of the Reversible Operation
post
Additional controls are installed in the
rear part of the cab. The figure on the
right illustrates their relative arrange-
ment.
1 – Clutch pedal. Stepping on the pedal
disengages the clutch. Removing
the foot from the pedal re-engages
the clutch.
2 – Tractor steering wheel (rearranged
from the forward movement column
(9)).
3 – Brake pedal. Stepping on the pedal
applies both the tractor brakes and
pneumatic actuator of the trailer
brakes.
4 – Fuel feed control pedal. When de-
pressed, the fuel feed increases.
5 – Horn push pad.
6 – Fuel feed control lever. The rear-
most position (in reverse) corre-
sponds to the maximum fuel feed
while the foremost position – to the
engine shutdown.
7 – GB range selector lever (refer to
Shifting Diagram I).
8 – GB gear-shift lever (refer to Shifting
Diagram II).
9 – Forward-movement steering col-
umn.
To drive the tractor in reverse, proceed
as follows:
•
interlock the forward-movement brake
pedals;
•
remove the steering wheel from the
column and fit it on the additional
steering column. To do this, screw off
the steering-wheel fixing handwheel,
rearrange the steering wheel and fix it
at the required height;
•
install the reversing seat for operation
in the reverse mode;
•
Switch the clutch control to the re-
verse move.
1 – clutch pedal; 2 – steering wheel; 3 – brake
pedal; 4 – fuel-feed control pedal; 5 – horn push-
pad; 6 – fuel-feed lever; 7 – GB range selector
lever; 8 – GB gear-shift lever; 9 – forward-
movement steering column.
Содержание 1523
Страница 1: ...BELARUS 1523 1523В 1523 3 1523В 3 1523 0000010 РЭ OPERATING MANUAL 2009 ...
Страница 70: ......
Страница 72: ......
Страница 76: ......
Страница 77: ...BELARUS 1523 1523В 1523 3 1523В 3 Construction and Operation 73 ...
Страница 78: ......
Страница 123: ...BELARUS 1523 1523В 1523 3 1523В 3 Construction and Operation 118 1 drum 2 semi clutch 3 pusher 4 shim 5 switch 6 cover ...
Страница 124: ......
Страница 131: ......
Страница 137: ......
Страница 151: ......
Страница 160: ......
Страница 162: ...BELARUS 1523 1523В 1523 3 1523В 3 Construction and Operation 152 ...
Страница 163: ......
Страница 172: ...BELARUS 1523 1523В 1523 3 1523В 3 Construction and Operation 161 Connecting bundles of the RHL control system ...