FLIPPING™ ARCH
1MANUL027
Belanger®, Inc. *PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
17
Installation
Nozzle Kits
Note:
At this point, the Main Feed on the Head Assembly should be plumbed to the main water
supply for the Arch. If it is not, see Arch Assembly, Step 5, earlier in this manual.
Note:
IT IS NECESSARY TO FLUSH THE MANIOLDS WITH WATER BEFORE
INSTALLING ANY NOZZLES.
Installing Check Bodies and Nozzles
1. Locate the 12 supplied Nozzle Check Bodies and 12 supplied nozzles. See the image below.
2. Install the 12 supplied Nozzle Check Bodies. See the images below.
Note:
Lubricate the Check Body threads with a Liquid-Teflon™ for easier installation and
maintenance.
Check Body
Apply Liquid Teflon™ to the
Threads at Installation
Check Body (4)
in Each Leg
Check Cap
Leg Check Body Orientation
–
Check Cap Facing Toward the Ground
Head Check Body Orientation
–
Check Cap Facing Toward the
Outside of the Arch
Apply Liquid Teflon™ to the
Threads at Installation
Check Body (4)
in the Head
Beam Assembly
Check
Cap
Entrance Side
Exit Side
Passenger Side
Driver Side