12.2 Decommissioning work
Illustration
Description / explanation
X2
X2
X1
X1
1. Interrupt the condensate feed via the condensate inlet
line
[X1]
(e.g. by closing the recommended shut-off
valve
[X2]
).
Power
Alarm
Service
TEST
2.
Press the TEST button briefly multiple times.
0
The
BEKOMAT
®
is depressurised
0
The condensate remaining in the
BEKOMAT
®
is
drained
3. Disconnect the
BEKOMAT
®
from the voltage supply
and switch off all power.
BEKOMAT
®
33iU / 33iU CO
Original installation and operation manual
58 | 68
Содержание BEKOMAT 33iU
Страница 1: ...EN BEKOMAT 33iU 33iU CO 01 4244 Original installation and operation manual BM33iU BM33iU CO ...
Страница 65: ...16 2 Declaration of Conformity Original installation and operation manual BEKOMAT 33iU 33iU CO 65 68 ...
Страница 67: ...17 Notes Original installation and operation manual BEKOMAT 33iU 33iU CO 67 68 ...