Wrong
Right
Description / explanation
Discharge from pressurised pipes
•
Divert the flow of gas to provide a deflecting
surface to discharge the fluid components in
the gas.
6.3 Assembly work
For assembly work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Prerequisites
Tools
Material
Protective equipment
• Spanner or adjustable end wrench
• Hexagon socket key 10 mm
• Sealants e.g. PTFE
• Feed line
• Drain line
• Hose, interior diameter
13 mm (0.51 in),
length approx. 30 cm (1 ft)
Always to be worn:
Preparatory tasks
1.
Depressurise the pressurised system or the respective system section and secure it against unintentional
pressurisation.
Original installation and operation manual
BEKOMAT
®
33iU / 33iU CO
31 | 68
Содержание BEKOMAT 33iU
Страница 1: ...EN BEKOMAT 33iU 33iU CO 01 4244 Original installation and operation manual BM33iU BM33iU CO ...
Страница 65: ...16 2 Declaration of Conformity Original installation and operation manual BEKOMAT 33iU 33iU CO 65 68 ...
Страница 67: ...17 Notes Original installation and operation manual BEKOMAT 33iU 33iU CO 67 68 ...