Connection work - series connection
Illustration
Description / explanation
X5
H
6
X6
G
6
6. Fit the counter nuts
[6]
over the connection cable
[X5]
and insert connection cable
[X6]
.
7. Insert the connection cable
[X5]
into the left cable
gland
[H]
.
8. Insert the connection cable
[X6]
into the right cable
gland
[G]
.
Connection cable
[X6]
Connection cable
[X5]
9. Connect connection cable
[X5]
and connection
cable
[X6]
according to the terminal diagram “4.7
6
G
X6
6
H
X5
10. Draw cable
[X5]
and connection cable
[X6]
taut.
11. Screw the counter nuts
[6]
onto the left cable
gland
[H]
and right cable gland
[G]
.
2
1
12. Set the top cover
[2]
in place and insert the screws
[1]
.
13. Tighten the screws
[1]
with a torque of
0.9 Nm +0.5 Nm (0.66 ft-lb +0.37 ft-lb).
BEKOMAT
®
33iU / 33iU CO
Original installation and operation manual
38 | 68
Содержание BEKOMAT 33iU
Страница 1: ...EN BEKOMAT 33iU 33iU CO 01 4244 Original installation and operation manual BM33iU BM33iU CO ...
Страница 65: ...16 2 Declaration of Conformity Original installation and operation manual BEKOMAT 33iU 33iU CO 65 68 ...
Страница 67: ...17 Notes Original installation and operation manual BEKOMAT 33iU 33iU CO 67 68 ...