10.2 Maintenance schedule
Maintenance
Interval
Changing the Service-Unit
After 2 x 8760 operating hours or 1 million switching cycles*; at least every 2 years
Cleaning
Annually
Functional test
Monthly
Visual inspection
Weekly
Leakage test
After assembly and maintenance works on the product
* based on 7 bar(g) (101.5 psi(g)) and pH-neutral condensate
10.3 Maintenance work
For assembly work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Prerequisites
Tools
Material
Protective equipment
•
Screwdriver – flat head
size 2.5 mm (0.09")
• Spanner or adjustable end wrench
• Sealants
• Lubricant for greasing the O-rings
• Mild detergent
• Cotton or disposable cloth
•
BEKO
TECHNOLOGIES
Service-Unit
•
BEKO
TECHNOLOGIES set of seals
Always to be worn:
10.3.1 Changing the Service-Unit
Exchange work
Illustration
Description / explanation
X2
X1
1. Interrupt the condensate feed via the condensate inlet
line
[X1]
(e.g. by closing the recommended shut-off
valve
[X2]
).
Original installation and operation manual
BEKOMAT
®
33iU / 33iU CO
45 | 68
Содержание BEKOMAT 33iU
Страница 1: ...EN BEKOMAT 33iU 33iU CO 01 4244 Original installation and operation manual BM33iU BM33iU CO ...
Страница 65: ...16 2 Declaration of Conformity Original installation and operation manual BEKOMAT 33iU 33iU CO 65 68 ...
Страница 67: ...17 Notes Original installation and operation manual BEKOMAT 33iU 33iU CO 67 68 ...