28
Connect the line from
the regulator on
cylinder 1 to port 1 at
the back of the monitor.
Ensure the collar on the
hose is drawn back
prior to fitting onto the
port stump. The collar
should spring forward
and lock into place with
a positive click.
To test connection,
gently pull back
on the rear of
the connector,
ensure that you
are not pulling on
the collar release
element. The
connection should
be secure.
Collar drawn back
Collar sprung forward
Collar back, introduce to port
Push onto port, collar springs
forward and locks in place
When needle is in green
area, cylinder is full
Needle must point to at least
20 bar (above red area)
Check that each supply
cylinder has sufficient
contents to commence
treatment: open cylinder
valve fully, then close
valve fully. A supply
cylinder should have a
fill pressure greater than
20 bar before
commencing treatment.
If the gauge needle is in
the red area, the cylinder
is empty and must not
be used for treatment.
Replace this supply
cylinder to begin setup.
If the cylinder is empty,
the system test for
cylinder pressure
contents in the
onscreen QSG will
pause setup.
9.
8.
10.
6.
7.
Содержание NOxBOX mobile
Страница 2: ......
Страница 39: ...39 5 5 4 Neopuff Resucitator ...
Страница 47: ...47 Once completed successfully the NOxBOXi is ready for attachment to the patient to commence treatment ...
Страница 82: ...82 Notes ...
Страница 83: ...83 Notes ...