Test Procedures – 7
7–17
Time Delay Accuracy Test
Test Settings:
Magnitude #1
1.10 pu
(132 V rms for a sinusodial input)
Time Delay #1
5 cycles
Function 59
Disable
10. Press ENTER. The SELECT FUNCTION LED
should turn on and the unit should display
VOLTAGE RELAY
VOLT freq curr powr
C
11. Press ENTER. The unit should display
OVERVOLTAGE SETPOINTS
PHASE_OVER phase_under
C
12. Press ENTER until the unit displays
DELAY PEAK OVERVOLT #1
1 Cycle
13. Change the setpoint by turning the knob
counterclockwise to 5 cycles. The unit should
display
DELAY PEAK OVERVOLT #1
5 Cycles
14. Press ENTER once and then EXIT until the
unit displays
BECKWITH ELECTRIC CO.
M-0420
15. Increase the input voltage on Phase A to
136 V ac and start timing. The unit should
trip after 5 cycles ±1 cycle time delay.
16. The 59 OVERVOLTAGE LED should turn
on and the unit should rotate displays
-TRGT- 06/22/93 10:19:12
Trip# = 7
-TRGT- 06/22/93 10:19:12
PEAK OVERVOLTAGE #1
-TRGT- 06/22/93 10:19:12
PHASE A=X B= C=
17. Set the input voltage to 120 V.
18. Press TARGET RESET/LAMP TEST. The
59 OVERVOLTAGE LED should turn off.
The unit should display
BECKWITH ELECTRIC CO.
M-0420
—END—
59I
PEAK OVERVOLTAGE (CONT)
Содержание M-0420
Страница 56: ...M 0420 Instruction Book 3 4 This Page Intentionally Left Blank ...
Страница 92: ...M 0420 Instruction Book 5 28 This Page Left Intentionally Blank ...
Страница 156: ...A 8 M 0420 Instruction Book This Page Intentionally Left Blank ...
Страница 160: ...B 4 M 0420 Instruction Book This Page Intentionally Left Blank ...
Страница 164: ...C 4 M 0420 Instruction Book This Page Intentionally Left Blank ...
Страница 165: ...D 1 Board Interconnections Appendix D D Board Interconnections Figure D 1 M 0420 Board Interconnections ...
Страница 166: ...D 2 M 0420 Instruction Book This Page Intentionally Left Blank ...
Страница 174: ...E 8 M 0420 Instruction Book This Page Intentionally Left Blank ...