Testing and Adjustments

9. Verify front panel line pressure gauge reading

is as indicated in Table 1 (line regulator).  If
pressure is not correct, refer to Line Regulator
Adjustment procedure.  Note reading for later
use.

10. Close vent valve.  Watch pressure gauge

readings of left side bank regulator and front
panel line pressure gauge for at least five
minutes.  Readings may be slightly higher
without vent flow.  Verify readings do not
continue to increase.

11. Close all liquid containers on left side of

manifold.  Open vent valve slightly so that
front panel left bank contents gauge drops
slowly.  Verify manifold switches to right bank
when left bank pressure gauge drops to value
indicated in Table 1 (Left Secondary Supply
Switch).  If pressure value is not correct, left
secondary supply pressure switch needs
adjustment.  Refer to Secondary Supply
Switch Adjustment procedure.

12. Close vent valve.  Verify the following:

• Only right bank green "IN USE" and left

bank red "EMPTY" lights are illuminated.

• If manifold is connected to a master alarm

panel, verify only manifold “SECONDARY
SUPPLY” alarm is activated.

13. Close two right-side line regulator isolation

valves and open two left-side line regulator
isolation valves.

14. Open vent valve to create a small flow of gas

through manifold.  Vent valve must be opened
wide enough so that right side bank regulator
gauge (attached to right dome regulator body)
just begins to slightly drop.

15. Verify pressure gauge reading on right bank

regulator is as indicated in Table 1

(intermediate pressure - in use bank).  If
pressure is not correct, refer to Bank
Regulator Adjustment procedure.

16. Verify front panel line pressure gauge reading

is the same as in step 9.  If pressure is not
correct, refer to Line Regulator Pressure
Adjustment procedure.

17. Close vent valve.  Watch pressure gauge

readings of right side bank regulator and front
panel line pressure gauge for at least five
minutes.  Readings may be slightly higher
without vent flow.  Verify readings do not
continue to increase.

18. Close all high-pressure cylinders connected to

right side of manifold.  Open vent valve slightly
so that front panel right bank contents gauge
drops slowly.  Verify right bank green “IN USE”
light turns off and right bank red “EMPTY” light
illuminates when right bank pressure gauge
drops to value indicated in Table 1 (Right
Secondary Supply Switch).  If pressure value
is not correct, right pressure switch needs
adjustment.  Refer to Secondary Supply
Switch Adjustment procedure.

19. Close vent valve. 
20. Open vent valve slightly so that front panel

right bank pressure gauge continues to slowly
drop.  When right bank pressure is nearly
depleted, right bank regulator intermediate
pressure gauge will also begin to drop.  Verify
that power supply red “RESERVE IN USE”
indicator illuminates when right bank
intermediate pressure gauge drops to value in
Table 1 (Reserve In Use Switch).  If pressure
is not correct, refer to Reserve In Use Switch
Adjustment procedure.

21. Close vent valve.  If manifold is connected to a

master alarm panel, verify “SECONDARY
SUPPLY” and “RESERVE IN USE” alarms are
activated.

NOTE:

Line regulator settings listed in Table 1 are
nominal factory settings.  Actual customer
settings may vary.

Содержание Lifeline Medical Systems

Страница 1: ...Part No 6 847703 00 Rev C00 Pg 1 Lifeline Medical Systems Fully Automatic Manifold For Use With Liquid Cylinders Installation Operation and Service Manual LQ x HP Liquid x High Pressure Models...

Страница 2: ...y Supply Switch Replacement 49 Bank Regulator Replacement 49 Line Regulator Replacement 51 Abbreviations AR Argon CGA Compressed Gas Association CO2 Carbon Dioxide N2 Nitrogen N2O Nitrous Oxide NPTF N...

Страница 3: ...ce WARNING Means there is a possibility of injury or death to yourself or others CAUTION Means there is a possibility of damage to unit or other property NOTE Indicates points of particular interest f...

Страница 4: ...opriate number of header floor stand kits for manifold s right bank header extensions and reserve header assembly sold separately Manifold System Components Precautions WARNING Tampering with gas spec...

Страница 5: ...bracket away from manifold control panel and slide bracket off two upper control panel mounting bolts 3 Mark wall 79 3 4 from finished floor in location where manifold will be mounted Convert mark to...

Страница 6: ...r of manifold control inlets to finished floor 5 Mark locations of mounting holes Remove bracket and drill mounting holes Attach bracket to wall with appropriate anchors by others 3 8 diameter anchors...

Страница 7: ...7 Part No 6 847703 00 Rev C00 Installation Figure 3...

Страница 8: ...ch header extension so they are pointing out away from wall and tighten header extension Figure 4 CAUTION Do not use thread sealant on header or pigtail connections CAUTION Each header segment must be...

Страница 9: ...f header extensions two or more header brackets will be provided Header brackets should be positioned along length of high pressure reserve header assembly and should contact header directly between c...

Страница 10: ...n Master Valve Nut Plug Reserve Low Pressure Switch Regulator Assembly Figure 7 Nut Plug Header Extensions NOTE Configuration and number of header extensions will vary depending upon size of high pres...

Страница 11: ...be required A bracket is provided for each header segment and should contact header between cylinder connections as shown in Figure 9 Top of bracket aligned with horizontal line on wall Above finished...

Страница 12: ...ng nut as shown in Figure 1 Pull bottom of bracket away from manifold control panel and slide bracket off two upper control panel mounting bolts 3 Only bracket will be needed at this time Set manifold...

Страница 13: ...nch channel is used to mount power supply and may be located on either side of manifold control panel Use flat plate four each 3 8 bolts flat washers and channel nuts Unlike other hardware shown in Fi...

Страница 14: ...DETAIL A DETAIL B DETAIL C DETAIL D CAUTION In order to prevent damage to manifold piping connections vertical stands must be securely braced to permanent structure to prevent movement DETAIL E Insta...

Страница 15: ...ositioned along length of high pressure reserve header assembly and should contact header directly between cylinder connections Bracket to support control section must be located as shown in Figure 13...

Страница 16: ...on outlet side of valve to aid in purging Main Outlet and Relief Valve Connection CAUTION Close 3 4 source shut off valve to prevent debris from falling into manifold during brazing procedure To prev...

Страница 17: ...e The fuse type is 5 x 20 mm GMD 250mA 240 VAC models use 0 125 Amp time delay type 5 x 20 mm GMD 125mA Installation Power Supply Installation For connection to a remote alarm or building automation s...

Страница 18: ...ound 120 VAC Input Power Secondary Supply Reserve In Use Reserve Low From reserve low switch located on high pressure reserve header Figure 6 7 8 Dry Normally Closed Remote Alarm Contacts 1 2 3 4 5 6...

Страница 19: ...nd 16 Secure each cylinder to wall or floor stand with chains or straps 4 Connect pigtails to each cylinder Rigid copper pigtails used on oxygen systems are pre formed to approximate required shape Lo...

Страница 20: ...20 Part No 6 847703 00 Rev C00 Figure 15 Figure 16 Installation 72 Flex Pigtail 24 Stainless Steel Flex Pigtail 72 Flex Pigtail Rigid Copper Pigtail...

Страница 21: ...ESERVE IN USE and RESERVE LOW alarms are activated 3 Close 3 4 source shut off valve 4 Slowly open one cylinder on high pressure reserve header assembly 1 Release two latches on sides of manifold cove...

Страница 22: ...s gauge drops slowly As left contents gauge is nearly depleted manifold changes over to right bank After change over left bank green IN USE light turns off and red EMPTY light illuminates After change...

Страница 23: ...23 Wait 15 minutes 24 Compare current readings of manifold left and right gauges and reserve header contents gauge to those recorded in step 19 and 20 If there is a noticeable pressure change on eith...

Страница 24: ...lve Vent Valve Line Regulator Isolation Valves Line Regulator Isolation Valves Master Valve Power Supply Connector Master Valve Right Bank Contents Gauge Left Bank Contents Gauge Reserve Header Conten...

Страница 25: ...oss of pressure on manifold line pressure gauge indicates a leak downstream of closed line regulator inlet isolation valves A loss of pressure on left manifold contents gauges indicates a leak in comp...

Страница 26: ...l be prohibited Do not alter remove or modify gas specific connections Before connecting liquid container to left bank of manifold or high pressure cylinder to right bank of manifold and reserve heade...

Страница 27: ...drop 500 10 400 10 500 10 500 10 Reserve In Use Switch on pressure drop 80 5 210 5 210 5 210 5 Reserve Low Switch on pressure drop 1500 25 400 25 1500 25 1500 25 Reserve Header Regulator 70 200 200 20...

Страница 28: ...15 18 20 23 26 29 32 37 41 44 48 52 55 Delivery Flow scfm Delivery Pressure psig Operation Flow Characteristics at 300 psig Inlet with 100 psig Delivery 0 10 20 30 40 50 60 70 80 90 100 110 0 8 10 12...

Страница 29: ...by flow capacity of liquid container s Approximate maximum continuous gaseous flow of liquid containers are listed below Gas Type Flow per container Oxygen 5 8 scfm 350 scfh Nitrous Oxide 1 8 scfm 110...

Страница 30: ...tors in event of an overpressure condition caused by bank regulator or high pressure reserve header regulator failure Outlet of relief valve is piped to a common relief valve port on top of manifold R...

Страница 31: ...ill open Activation of switch indicates that contents of high pressure cylinders has been partially depleted either by use or leakage Front Panel Indicators Six front panel indicators monitor status o...

Страница 32: ...ulator Dome Regulator Bank Regulator Bank Regulator Line Relief Valve Intermediate Relief Valve Check Valve Line Regulator Isolation Valve Line Regulator Isolation Valve Line Regulator Isolation Valve...

Страница 33: ...olenoid Valve Left Bank Pressure Gauge Right Bank Pressure Gauge Line Pressure Gauge NOTE Some components not shown for clarity Figure 21 Reserve Header Master Valve Reserve Header High Pressure Regul...

Страница 34: ...heck Valve Bank Regulator Bank Regulator Inlet Relief Valve Bank Gauge Bank Gauge Check Valve Dome Regulator Relief Valve Outlet Right Bank Inlet Left Bank Inlet From High Pressure Reserve Header Figu...

Страница 35: ...03 00 Rev C00 Operation Figure 23 High Pressure Regulator Reserve Low Pressure Switch Master Valve Check Valves High Pressure Cylinder Pigtails To Manifold Control Panel Figure 22 High Pressure Reserv...

Страница 36: ...PSI Outputs of both left and right bank regulators each pass through check valves and connect together upstream of a dual line regulator assembly An intermediate relief valve protects components betwe...

Страница 37: ...and pressure is restored manifold will automatically switch back to left bank Solenoid valve will deenergize and direct dome bias back to left dome regulator Right bank green IN USE light will turn of...

Страница 38: ...on power supply box are NOT illuminated If manifold is connected to a master alarm panel SECONDARY SUPPLY RESERVE IN USE and RESERVE LOW alarms are NOT activated 6 If manifold is equipped with a dome...

Страница 39: ...ndicated in Table 1 intermediate pressure in use bank If pressure is not correct refer to Bank Regulator Adjustment procedure 16 Verify front panel line pressure gauge reading is the same as in step 9...

Страница 40: ...o a master alarm panel SECONDARY SUPPLY and RESERVE IN USE alarms remain activated 27 Slowly open one high pressure cylinder on right side of manifold Verify the following Power supply red RESERVE IN...

Страница 41: ...all high pressure cylinders connected to high pressure reserve header 7 Open vent valve to vent all pressure from manifold 8 Close vent valve and slowly open one liquid container or high pressure cyl...

Страница 42: ...e 24 Figure 25 B A NOTE Some components not shown for clarity Switches Shunt NOTE When circuit board shunt is installed LQ x HP models only manifold will default to left bank liquid containers as prim...

Страница 43: ...p of small screwdriver into adjustment barrel and rotate barrel Figure 26 Line Regulator Adjustment The following procedure describes process of setting line regulator pressure This procedure should o...

Страница 44: ...rotate barrel Figure 26 See NOTE above 9 Slowly open one high pressure cylinder on right bank of manifold 10 Repeat steps 3 through 9 until pressure switch has been set within acceptable limits NOTE W...

Страница 45: ...ustment barrel and rotate barrel Figure 26 NOTE When viewing switch from wire end rotating barrel clockwise will raise switch setting A counterclockwise rotation will lower switch setting Make small a...

Страница 46: ...pressure cylinder on reserve header and adjust vent valve so that high pressure gauge on reserve header regulator drops very slowly 6 Note high pressure gauge reading when red RESERVE LOW light on pow...

Страница 47: ...ifold parts tools and work surfaces free of oil grease and dirt These and other flammable materials may ignite when exposed to high pressure oxygen or nitrous oxide Use only proper repair tools and pa...

Страница 48: ...e felt indicating ferrule is being resprung into sealing position Then tighten nut 1 12 of a turn 1 2 of a wrench flat past original position If tightening a fitting for first time make sure tube has...

Страница 49: ...outer wire screens Take care not to dislodge filter or screens Service Procedures Secondary Supply Switch Replacement The following procedure describes process of replacing secondary supply pressure...

Страница 50: ...trol board Carefully unscrew pressure switch and allow wires to twist Removal of switch typically requires 4 5 revolutions When reinstalling switch twist wires 4 5 revolutions in a counterclockwise di...

Страница 51: ...nion nuts NOTE Before removing fittings from old regulator note orientation and depth of fitting in regulator body In order to align with isolation ball valves fittings must be installed into new regu...

Страница 52: ...from reserve header by loosening zero clearance o ring sealed union on output side of reserve header regulator 4 After all pressure has been vented remove reserve low pressure switch from elbow fitti...

Страница 53: ...cabinet 10 Verify correct operation of new control board by performing Performance Verification Control Board Replacement Service Procedures Reserve Low Switch Replacement The following procedure des...

Страница 54: ...HP reserve header AC INPUT POWER LINE NEUTRAL GROUND BLACK PIN 5 WHITE PIN 6 RED PIN 3 BROWN PIN 7 BLUE PIN 1 GREEN PIN 2 BLACK PIN 5 WHITE PIN 6 RED PIN 3 BROWN PIN 7 GREEN PIN 2 BLUE PIN 1 BLACK BL...

Страница 55: ...e 300 PSI 7 6 130117 00 Bank Pressure Gauge 3000 PSI 8 6 515601 00 Female Connector 1 8 Tube x 1 4 NPT 9 6 513011 00 Reducing Coupler 1 8 NPT x 1 4 NPT 10 6 515602 00 Male Connector 1 8 Tube x 1 8 NPT...

Страница 56: ...230764 00 Inlet Relief Valve 400 PSI 25 6 355010 UB Copper U Tube 5 8 OD 26 6 515629 00 Male Elbow 1 8 Tube x 1 4 NPT 27 6 515605 00 Male Connector 1 8 Tube x 1 4 NPT 28 6 122010 00 Bank Regulator all...

Страница 57: ...ted Parts List Line Regulator Components 33 34 35 Item Part No Description 33 6 622610 00 O Ring Line Regulator Ball Valve 34 6 230783 00 Ball Valve 1 2 NPT 35 6 122012 00 Line Regulator Denotes conne...

Страница 58: ...x 1 8 NPT 40 6 611645 01 1 8 Nylon Tube 5 5 41 6 230760 75 Line Relief Valve 75 PSI 6 230761 50 Line Relief Valve 150 PSI 6 230762 50 Line Relief Valve 250 PSI 42 6 515641 00 Male Run Tee 1 8 Tube x...

Страница 59: ...8 Nylon Tube 6 5 48 6 616592 00 Union Tee 3 8 Tube 49 6 611645 03 3 8 Nylon Tube 2 5 50 6 611645 03 3 8 Nylon Tube 2 51 6 611645 03 3 8 Nylon Tube 3 5 52 6 611645 03 3 8 Nylon Tube 5 5 53 6 616591 00...

Страница 60: ...0 Part No 6 847703 00 Rev C00 Illustrated Parts List Cabinet Cover Components 55 56 Item Part No Description 55 6 838153 00 Manifold Cover Draw Latch includes item 57 56 6 616505 00 Front Cover Window...

Страница 61: ...61 Part No 6 847703 00 Rev C00 Illustrated Parts List Cabinet Base Plate Components 57 Item Part No Description 57 6 838153 00 Manifold Base Latch Includes item 55...

Страница 62: ...911 72 Nitrous Oxide CGA 326 6 290914 72 Nitrogen or Argon CGA 580 6 290920 72 CO2 CGA 320 61 48 Liquid Cylinder Vent Hose 6 290840 48 Oxygen CGA 440 6 290841 48 N2O N2 CO2 or Argon CGA 295 62 6 51570...

Страница 63: ...Nitrogen or Argon CGA 580 6 511615 20 CO2 CGA 320 65 6 515708 00 Union Bushing 1 11 1 2 NPT x 1 2 NPT 65 WARNING Check valve spuds for liquid containers item 58 page 62 have a maximum operating press...

Страница 64: ...63 68 67 66 68 67 66 Lifeline Manifolds manufactured prior to October 2006 used check valves with 1 2 NPT connections on header segments Note square block sections where check spuds thread into heade...

Страница 65: ...6 135000 KT Control Panel Stand Kit shown on Pg 12 6 135001 KT Header Stand Kit shown on Pg 12 Replacement Pigtail O Rings Washers Replacement O rings Pkg of 10 not shown 6 622612 PG Oxygen CGA 540 6...

Страница 66: ...Ring Zero Clearance Fitting 77 6 130116 00 Pressure Gauge 300 PSI 78 6 130117 00 Pressure Gauge 3000 PSI 79 6 868009 00 Pressure Switch set 1500 psi must be reset for N2O CO2 80 6 120005 00 Master Va...

Страница 67: ...85 LQ Power Supply Circuit Board 120 VAC 6 231984 LQ Power Supply Circuit Board 240 VAC 82 6 867268 RD Panel Mount LED Red 83 6 865549 00 1 4 Amp Fuse 5 x 20 mm GMD 250mA 6 865542 00 1 8 Amp Fuse 5 x...

Страница 68: ...or Rings and Bearings 8 000 operating hours or 3 years LifeLine Desiccant Dryer Systems 30 months 24 months The 441 Valve in all LifeLine dryers is warranted for 10 Ten Years LifeLine Lubricated Vane...

Отзывы: