
Installation manual
HB-37420-810-01-25F-EN SMX100 Installation manual.docx
Page 15 of 260
Version: 25F
WARNING:
Using our devices contrary to the rules and conditions specified hereunder can lead to
injuries or fatalities as well as damage to connected devices and machines!
This will also cause the loss of all warranty and compensation claims against BBH.
2.4 Operation and service
The module must always be de-energized before installation and removal, or before
disconnecting signal lines. For this purpose all live supply lines to the device must be checked
for safe isolation from supply.
When installing or removing the module appropriate measures must be applied to prevent
electrostatic discharge to the externally arranged terminal and plug connections. Contact with
such terminals should be reduced to a minimum and earthing should by means of e.g. an
earthing strap should take place before and during these procedures.
2.5 Transport/storage
Information concerning transport, storage and proper handling must be strictly followed.
The climate related specifications in chapter "Technical data" must be complied with.