
8 Checking and maintenance
8.1
General instructions
WARNING
4
Maintenance operations must be done by a qualified
engineer.
4
An annual inspection is compulsory.
4
Only original spare parts must be used.
4
Carry out the inspection and standard maintenance operations
once a year.
4
Carry out specific maintenance operations if necessary.
8.2
Standard inspection and maintenance operations
WARNING
Ensure that the boiler is switched off. Electrical isolation
can be checked at the electrical test point.
CAUTION
4
Always examine any seals or gaskets, replacing
where necessary. Where a seal or gasket is supplied
with a spare part it should be used, irrespective of the
condition of the original.
4
Use only original spare parts that are intended for use
with this type of boiler.
8.2.1.
Open the boiler
1. Unscrew the 2 screws, located on the front panel.
R000695-B
R000346-A
1
1
Baxi MainEco Combi and System 24 - 28 - 35 / 18 - 24
8. Checking and maintenance
02092014 - 7619497-02
53