P/N 128185 Rev A
Banner Engineering Corp. • Minneapolis, MN U.S.A.
www.bannerengineering.com • Tel: 763.544.3164
SureCross™ DX80 Quick Start Guide
3
1
2
3
4
5
6
7
8
8
1
2
3
4
5
6
7
Port, NPT Gland, or Plug
If unused, install the provided plug into the 1/2 NPT threaded port. Use PTFE tape if an IP67 seal is required.
Housing
The rugged, industrial DX80 housing meets IEC IP67 standards.
Mounting Hole, #10/M5 Clearance
Mounting Holes accept metric M5 or UNC/UNF #10 hardware -- DIN rail mount adapter bracket available
Wiring Terminal Strip
Wiring Terminal
The 16 spring-clip type wiring terminals accept wire sizes: AWG 12-28 or 2.5 mm
2
Port, PG-7 Gland or Blank
The PG-7 threaded ports can accept provided cable glands or blanks.
Ribbon Connector
Ribbon cable connects wiring base to LCD/radio.
5-Pin M12 Euro-style quick-disconnect fi tting
DX80 Gateway and Node Wiring Chamber