6. Adjustment
Assembly length of tension rod
Adjustment steps of tension rod assembly length
1- Loosen the connecting nut [A] [B]
2-Adjusting the assembly length of tension rod
by rotating the tension rod.
Attached: Tension rod assembly length @:
297mm
[A] Right-handed thread
[B] Left-handed thread
Connect [C] position to the steering vertical col
-
umn welding assy.
Connect [D] position to the front seat assy, the
front brake.
CAUTION:
The connection nut [A] [B] can be tightened up
only when the revealed thread length (b) of two
ends of tension rod are the same.
Attached: Connecting nut torque of tension rod:
30Nm
7. Inspection
If the bearing (1) and O-seal (2) under the
steering vertical welding are worn or damaged,
replace them.
(IV) Installment steps
The reversal steps of “Removal” steps are the
“Installment” steps. Pay attention to the follow
-
ing points during installment.
1. When installing steering vertical column
welding, lubricate the bearing (1) and seal ring
2 under the steering vertical column welding.
96
Содержание WD250U
Страница 1: ...WD250U Service Manual For any questions please contact Baja Motorsports at 888 863 2252 ...
Страница 23: ... II Wiring diagram 1 23 ...
Страница 24: ... III Wiring diagram 2 24 ...
Страница 25: ... IV Wiring diagram 1 25 ...
Страница 31: ...Section 8 Lubrication I Lubrication oil way 31 ...
Страница 120: ...119 ...