SUPPORT SERVICES
TRAINING
WBPEEUI110505A0
9 - 7
Tank Flange/Cell with Characterization Board Assembly Replacements
To order compensated spare or replacement tank flange/cell
with characterization board assemblies:
1. Obtain the first nine characters of the transmitter nomen-
clature from the nameplate.
2. Replace the L in position 5 with a 7.
3. Add an A1 to the end to complete the 11-position nomen-
clature of the compensated tank flange/cell with characteriza-
tion board assembly.
Example:
A replacement tank flange/cell with characterization board assembly is
required for a Type PTSDLD1A1B10100 level transmitter. Following the
procedure:
1. The first nine characters of the transmitter nomenclature
are
PTSDLD1A1
.
2. Replacing the L in position 5 with a 7 yields
PTSD7D1A1
.
3. Adding an A1 to the end results in the 11-position nomen-
clature for the compensated replacement tank flange/cell with
characterization board assembly,
PTSD7D1A1A1
.
TRAINING
Bailey Controls Company has a modern facility available for
training your personnel. On-site training is also available.
Contact a Bailey Controls Company sales office for specific
information and scheduling.
258555_3 Standard
Stainless
steel
P T S D L -
-
-
-
-
-
-
A
0
-
P T S D L -
-
-
-
-
-
-
A
1
-
258555_4 Cover
with win-
dow
Stainless
steel
P T S D L -
-
-
-
-
-
-
A
A
-
P T S D L -
-
-
-
-
-
-
A
B
-
P T S D L -
-
-
-
-
-
-
A M
-
P T S D L -
-
-
-
-
-
-
A
N
-
NOTE:
1. Each kit contains one housing cover with O-ring installed and 0.25 oz. NEVER-SEEZ lubricant.
Table 9-13. Cover, Housing
(continued)
Kit
Number
1
Cover
Type
Cover
Material
Applicable Types
Position
1
2
3
4
5
6
7
8
9 10 11 12 13 14 15
Содержание Platinum standard Series
Страница 1: ......