![Bailey Platinum standard Series Скачать руководство пользователя страница 79](http://html1.mh-extra.com/html/bailey/platinum-standard-series/platinum-standard-series_product-instruction_467169079.webp)
REPAIR AND REPLACEMENT PROCEDURES
COMPONENT REMOVAL AND INSTALLATION PROCEDURES
8 - 4
WBPEEUI110505A0
11. Remove the cell, process and cover O-rings (Figs.
and
).
Tank Flange/Cell and Characterization Board Assembly Installation
1. Refer to
and determine the proper replacement
cell, process flange, and cover O-rings for the application.
CAUTION
Do not attempt to remove the two screws that secure the cell
and characterization board assembly to the tank flange assem-
bly. The capillary is welded into place. Attempting to remove
the cell and characterization board assembly from the tank
flange assembly could damage the weld.
Figure 8-2. Tank Flange/Cell and Characterization Board Assembly
T 02 23 6 A
C E LL O -R IN G
P R O C E S S
F LA N G E S T U D S (4)
D O N OT
R E M OV E
C A P ILL A RY
TA N K F LA N G E /C E LL A N D
C H A R AC T E R IZ ATIO N
B O A R D A S S E M B LY
C O AT TH IS A R E A W IT H
G R A P H IT E S E A LA N T
P R O C E S S O -R IN G
F LA N G E A DA P T E R O -R IN G
F LA N G E A DA P T E R B O LT S (2)
O P T IO N A L
F LA N G E A DA P T E R
P R O C E S S
F LA N G E N U T (8)
C H A R AC T E R IZ ATIO N
B O A R D
Содержание Platinum standard Series
Страница 1: ......