![Bailey C-I-CV42C Скачать руководство пользователя страница 45](http://html.mh-extra.com/html/bailey/c-i-cv42c/c-i-cv42c_instruction_467166045.webp)
5 - 2
WBPEEUI220771A0
Preventive Maintenance Schedule
Preventive Maintenance Schedule
Table
is the preventive maintenance schedule for the Con-
ductor VMS Series 42 Auxiliary Terminal. The table lists the
preventive maintenance tasks in groups according to their
specified maintenance interval. Some tasks in Table
are
self explanatory. Instructions for tasks that require further
explanation are found in the procedures or in the manufac-
turer’s documentation supplied with the workstation.
Table 5-1. Preventive Maintenance Schedule
Task
Procedure
Frequency
General cleaning, including, but not limited to:
Monitor
Printed circuit boards
Keyboards
As required
With power on, be sure fans are turning. With power off, wipe dust off
all fan blades.
N/A
1 month
Check cabinet and modules for dust. Clean as necessary using an anti-
static vacuum.
N/A
3 months
Check power supply outputs. Adjust power supplies if needed.
Check the air filters. Clean or replace them as necessary. Check the air
filter more often in excessively dirty environments.
N/A
6 months
Check all signal, power and ground connections within the cabinet and
verify that they are secure.
Check the quality of the plant power and grounding system. Follow the
power and grounding system verification procedures in
N/A
12 months
Inspect and check the PEP. In high vibration environments testing may
be necessary at shorter intervals.
2 years
Replace power supplies. Call Elsag Bailey sales and service for
information.
Figure
5 years
Complete all appropriate tasks in this table.
N/A
Shutdown
Содержание C-I-CV42C
Страница 1: ...Bailey Hartmann Braun TM Instruction Conductor Conductor VMS Series 42 Auxiliary Terminal ...
Страница 15: ...WBPEEUI220771A0 ...
Страница 43: ...WBPEEUI220771A0 ...
Страница 53: ...WBPEEUI220771A0 ...
Страница 67: ...WBPEEUI220771A0 ...
Страница 77: ...WBPEEUI220771A0 ...
Страница 93: ...PR1 2 WBPEEUI220771A0 Procedure 3 Turn each end latch turn 4 Open the door ...
Страница 97: ...WBPEEUI220771A0 ...
Страница 107: ...WBPEEUI220771A0 ...
Страница 113: ...WBPEEUI220771A0 ...
Страница 123: ...WBPEEUI220771A0 ...
Страница 125: ...WBPEEUI220771A0 ...
Страница 133: ...WBPEEUI220771A0 ...
Страница 137: ...WBPEEUI220771A0 ...
Страница 141: ...WBPEEUI220771A0 ...
Страница 143: ...WBPEEUI220771A0 ...
Страница 145: ...WBPEEUI220771A0 ...
Страница 147: ...WBPEEUI220771A0 ...
Страница 151: ...WBPEEUI220771A0 ...
Страница 177: ...PR27 6 WBPEEUI220771A0 Procedure 7 Install all cables onto the CPU ...
Страница 181: ...WBPEEUI220771A0 ...
Страница 184: ...Procedure WBPEEUI220771A0 PR29 3 Figure PR29 2 IIADP02 Bezel Removal T01401A REAR VIEW SCREWS 4 ADP ...
Страница 185: ...WBPEEUI220771A0 ...
Страница 195: ...WBPEEUI220771A0 ...
Страница 197: ...WBPEEUI220771A0 ...
Страница 213: ...WBPEEUI220771A0 ...