WBPEEUI220771A0
PR12 - 1
PR12
Work Surface Installation
Purpose/Scope
This procedure explains how to install the work surface.
Parts
Tools
None.
Procedure
□
1. Adjust the leveling screws on all main and auxiliary termi-
nals, and connecting tables until the monitor bezels are even.
The leveling screws adjust 26.7 millimeters (1.05 inches).
□
2. Once a unit is secure, insert the table support brackets
into the cabinet (Fig.
).
□
3. Lock the work surfaces into place by pushing the red han-
dle above the front door to the right until it stops at the bottom
of the slot.
10 min.
Number
Qty
Description
6638625?1
1
Work surface assembly
Содержание C-I-CV42C
Страница 1: ...Bailey Hartmann Braun TM Instruction Conductor Conductor VMS Series 42 Auxiliary Terminal ...
Страница 15: ...WBPEEUI220771A0 ...
Страница 43: ...WBPEEUI220771A0 ...
Страница 53: ...WBPEEUI220771A0 ...
Страница 67: ...WBPEEUI220771A0 ...
Страница 77: ...WBPEEUI220771A0 ...
Страница 93: ...PR1 2 WBPEEUI220771A0 Procedure 3 Turn each end latch turn 4 Open the door ...
Страница 97: ...WBPEEUI220771A0 ...
Страница 107: ...WBPEEUI220771A0 ...
Страница 113: ...WBPEEUI220771A0 ...
Страница 123: ...WBPEEUI220771A0 ...
Страница 125: ...WBPEEUI220771A0 ...
Страница 133: ...WBPEEUI220771A0 ...
Страница 137: ...WBPEEUI220771A0 ...
Страница 141: ...WBPEEUI220771A0 ...
Страница 143: ...WBPEEUI220771A0 ...
Страница 145: ...WBPEEUI220771A0 ...
Страница 147: ...WBPEEUI220771A0 ...
Страница 151: ...WBPEEUI220771A0 ...
Страница 177: ...PR27 6 WBPEEUI220771A0 Procedure 7 Install all cables onto the CPU ...
Страница 181: ...WBPEEUI220771A0 ...
Страница 184: ...Procedure WBPEEUI220771A0 PR29 3 Figure PR29 2 IIADP02 Bezel Removal T01401A REAR VIEW SCREWS 4 ADP ...
Страница 185: ...WBPEEUI220771A0 ...
Страница 195: ...WBPEEUI220771A0 ...
Страница 197: ...WBPEEUI220771A0 ...
Страница 213: ...WBPEEUI220771A0 ...