29
MAG
User Manual v2.0
√
The position on the left secures the sensor full
of liquid.
X
Central and right positions DO NOT guarantee
a pipe full of liquid.
Fig. 34 | Correct (LH) and incorrect installation (central and RH)
We recommend installing gate valves downstream of the meter.
Fig. 35 | Gate valves installation
X
In order to avoid a vacuum, always install the sensor downstream of the pump and NEVER upstream.
Fig. 36 | Avoid negative pressure