background image

1

MAG

User Manual v2.0

MAG

ELECTROMAGNETIC FLOW METERS

INSTRUCTION MANUAL

EN

Содержание MAG

Страница 1: ...1 MAG User Manual v2 0 MAG ELECTROMAGNETIC FLOW METERS INSTRUCTION MANUAL EN...

Страница 2: ...risk of electric shock All operations marked with this sign must be performed exclusively by qualified technical personnel CAUTION WARNING This symbol indicates vital information and points to be obs...

Страница 3: ...3 2 CERTIFICATES AND APPROVALS 15 3 3 GENERAL TECHNICAL FEATURES 16 3 4 ACCURACY 18 3 4 1 Reference conditions 18 4 INSTALLATION 20 4 1 MOVING 20 4 2 CONVERTER POSITIONINIG 21 4 2 1 Positioning instal...

Страница 4: ...ADAPTERS 51 6 5 METAL AND PLASTIC PIPES 52 6 6 PIPES EQUIPPED WITH CATHODIC PROTECTION 52 7 MAG CONVERTER PROGRAMMING 53 7 1 CONVERTER CONFIGURATION METHODS 53 7 1 1 Software MCE configuration 53 7 1...

Страница 5: ...cise instructions The manufacturer will be held responsible only if the converter will be used in its original configuration For applications that require high working pressures or use of substances t...

Страница 6: ...s See the following paragraphs for more detailed information on correct installation NOTES Electromagnetic flowmeters are designed specifically to operate under the following basic conditions 1 The li...

Страница 7: ...meter are Extraction and distribution points District level measures Irrigation Wastewater treatment systems Leak detection systems Remote applications without access to electrical grid Each Sensor m...

Страница 8: ...iameter of the flowmeter v is the fluid velocity k is the calibration constant emf e is proportional to the velocity v 2 1 1 Bidirectional reading The sensor has a possibility of bidirectional reading...

Страница 9: ...sensor The sensors in different versions can be connected to the converter in two different ways namely POWERED VERSION BATTERY VERSION Power 12 24 Vac dc or 90 264 Vac Aluminium casing Battery powere...

Страница 10: ...source because of their high energy density and are created to meet the highest safety standards However they can be potentially hazardous if they are exposed to electrical or mechanical abuse In man...

Страница 11: ...h the provisions of the ADR regulations for transport by truck ship Remove the battery from the transmitter before sending the flow meter to B METERS in case of maintenance or any intervention under w...

Страница 12: ...ing any browser and entering personal ID and password This option is available also on smartphones and tablets 2 8 OPTIONAL MODULES 2 8 1 Hart protocol available for compact version The converter can...

Страница 13: ...single versions of the MAG converters are shown below 3 1 1 Version MAG C MAINS POWERED VERSION 170 85 173 67 5 111 105 5 90 90 125 131 Fig 5 Dimensions MAG C MAINS POWERED VERSION 3 1 2 Version MAG...

Страница 14: ...Pole 173 67 5 105 5 170 85 111 125 307 90 90 60 22 70 118 125 178 85 102 Fig 7 Dimensions MAG S MAINS POWERED VERSION 3 1 4 Version MAG S BATTERY VERSION 170 85 111 125 307 90 90 118 125 178 85 102 60...

Страница 15: ...irective 2014 35 EU Harmonised standards For the versions without GSM EN 61010 1 For GSM versions EN 60950 1 RoHS Directive 2011 65 UE Certificates and international standards ISO 20456 Measurement of...

Страница 16: ...onsumption 5W 10W Output I O Analog output 4 20mA loop powered Output AUX 24Vdc max 30mA Transistor output for pulses max 1000 Hz duty cycle max 50 only for positive instantaneous flow rate positive n...

Страница 17: ...g hg kg q t lb Aft Optional modules GSM GPRS Totalizers 5 2 positive 2 negative 1 NET Alarms and status icons Status icons displayed and alarms recorded in the data logger Self check Available alarms...

Страница 18: ...racy class Mains Powered version Class 02 2 0 2 2mm s 1 20 1 00 0 80 0 60 0 40 0 20 0 00 0 20 0 40 0 60 0 80 1 00 1 20 0 0 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 4 5 5 0 5 5 6 0 6 5 7 0 7 5 8 0 8 5 9 0 9 5 1...

Страница 19: ...lass Battery version Class 05 5 0 5 5mm s 3 00 2 50 2 00 1 50 1 00 0 00 0 50 0 50 1 00 1 50 2 00 2 50 3 00 0 0 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 4 5 5 0 5 5 6 0 6 5 7 0 7 5 8 0 8 5 9 0 9 5 10 0 Error CL...

Страница 20: ...anges Below you will find a description of the correct and incorrect handling of the compact converter The proper lifting method for transport and installation of the compact converter is shown in Fig...

Страница 21: ...e 1 Fig 14 tighten firmly to ensure sealing closure WARNING Do not rotate the display unit beyond 90 in order to prevent the cables connected to the sensor from turning Also do not pull out the displa...

Страница 22: ...tube using two threaded hooks see 3 Fig 16 Then attach the converter see 4 Fig 16 Installation on a wall Bolt the clamp see 1 Fig 17 to the wall using the appropriate plug screws Then attach the conv...

Страница 23: ...d battery Permissible length Conductivity es cm Maximum cable length m 120 100 80 60 40 20 0 50 0 100 150 200 250 300 Relations between the conductivity of the liquid and the maximum allowed cable len...

Страница 24: ...ovements that could affect its performance and duration Install a suitable anti vibration protection if vibrations occur 4 3 2 Magnetic fields AVOID exposing the flowmeter to strong or nearby magnetic...

Страница 25: ...sed to direct sunlight 4 3 5 Operating temperatures For normal and efficient operating of the flowmeter The room temperature must be limited within the range of 25 60 C 13 140 F Fig 23 Avoid direct ex...

Страница 26: ...e Fig 26 4 4 2 Important guidelines for correct installation The junction box on the sensor is designed to have the IP68 protection degree only when properly closed and tightened The manufacturer does...

Страница 27: ...27 MAG User Manual v2 0 T connection downstream of the flowmeter Fig 28 Installation on U shaped tube Three dimensional curves Fig 29 Installation near three dimensional bends...

Страница 28: ...positions X We recommend installing the sensor on a vertical sloped pipe with an upward flow direction Fig 32 to minimize the wear and deposits in the sensor Avoid the installation on vertical pipes...

Страница 29: ...NOT guarantee a pipe full of liquid Fig 34 Correct LH and incorrect installation central and RH We recommend installing gate valves downstream of the meter Fig 35 Gate valves installation X In order t...

Страница 30: ...g the bolts Fig 39 Do not try to move the pipe closer to the sensor by tightening the bolts Also avoid the following positions Note Insertion meters can also be installed horizontally X DO NOT install...

Страница 31: ...on of the pipe flange faces is 0 5 mm Fig 43 Maximum allowable deviation 4 5 2 Sensor support DO NOT USE the sensor as a support for the pipe X The pipe must be the support for the flowmeter Fig 44 In...

Страница 32: ...orque given in the diagram All the values are theoretical and have been calculated for optimal conditions and with the use of carbon steel flanges Fig 46 Flange tightening DN PN BOLTS Maximum tighteni...

Страница 33: ...drainage and prevents dirt solidification on the sensor In addition it facilitates the location of the same if new excavations are required Before covering the gravel with earth we recommend using el...

Страница 34: ...wmeter The air pocket inside a pipe always moves toward the top of the pipe and it is assumed that the air will always move if the flow passes along a horizontal pipe but this is not the case Instead...

Страница 35: ...of the flowmeter By increasing the pressure in the duct the air pocket will compress causing fewer problems This can be achieved by installing pressure control valves after the flowmeter to maintain...

Страница 36: ...he general principle of each installation is to ensure that the device is always full of water however this is not always possible since a part of the network could drain when the pumps are turned off...

Страница 37: ...sshouldbeavoided Instead itispreferabletousecombinedpneumatic valves that incorporate an automatic orifice as well as a large kinetic orifice These valves ensure that the largest volumes of air are re...

Страница 38: ...s are high and if the section reduction is applied simultaneously with the use of reduced section meters In the case of low pressures the section reduction could also lead to cavitation formation espe...

Страница 39: ...CARD CONNECTED IN THE FACTORY 5 ELECTRICAL CONNECTION In order to properly connect electrical elements of the MAG converter to the power supply and to the junction box in REMOTE version please refer...

Страница 40: ...unused cable glands see 3 Fig 57 must always be closed with the relevant blind rubber sealings see 4 Fig 57 The used cable glands see 1 Fig 57 are suitable for multi wire cables with a minimum diamet...

Страница 41: ...with S N shown in the COUPLING item on the plate This information can also be found in the converter see menu Other System information The same information can be downloaded to your laptop with the MA...

Страница 42: ...ge required to detect the pulses The MAG acts as a digital switch logical level Maximum voltage 5 30Vdc maximum electrical current 50mA 1 12 34 56 78 Instrument connected to passive input The connecte...

Страница 43: ...r with other computer systems compatible with the MODBUS RTU standard for further information see the MODBUS address manual Loop powered The receiver 4 20mA connected to the instrument is loop powered...

Страница 44: ...ically connected to the pipes in plastic or with internal coating grounding rings are required Absent or incorrect grounding will result in unpredictable failure Fig 67 Note In the MAG REMOTE version...

Страница 45: ...BY QUALIFIED TRAINED PERSONNEL Make sure that all electrical connections have been made correctly before connecting the unit to the power supply Check the supply voltage on the plate The unit may be...

Страница 46: ...herefore follow the indications given in the relevant documentation Info If cables in the coil are used always use the ferrules for the connections in the terminal board and adequately insulate the sh...

Страница 47: ...cable The EXTERNAL shield of the electrode cable must be connected to the case on the earthing point of the separation box of the sensor A B T C D E F A B T C D E F Cavo Bobine Cavo Elettrodi Scatola...

Страница 48: ...rode cables C028 C028 cables are provided with double shielding one external and one additional shielding of the single signal cables of the measuring electrodes only Fig 71 Standard single shielded e...

Страница 49: ...ect grounding may lead to an incorrect measurement GROUNDING CABLE Minimum section 2 5 mm2 recommended 4 mm2 grounding screws M5 Recommended ground resistant value is 5 The flowmeter is equipped with...

Страница 50: ...or must be earthed using the appropriate ground screw placed on the converter casing Fig 74 Compact version grounding connection 6 2 PLASTIC PIPES Fig 75 Application of grounding rings Grounding rod P...

Страница 51: ...pipes 6 4 METAL PIPES WITH INSULATING ADAPTERS Fig 77 Grounding of the sensor on metal pipes with adapters In the case of metal pipes with an insulating coating follow the instructions for plastic pi...

Страница 52: ...n Isolate it from the pipeline by installing isolation bushings and washers on the bolts of the flange and connect a wire between the pipes large enough to handle the cathodic current and the environm...

Страница 53: ...call the unit for the next programming use the magnetic key see 1 Fig 83 provided only with the MAG and slide it vertically on the front panel of the converter to the point marked with ACTIVATE Fig 84...

Страница 54: ...infra red see 2 Fig 85 and click the button CONNECT see 3 Fig 85 It is possible to change the display language of the software menu by following this path Settings Change Language and choosing one of...

Страница 55: ...the converter can be programmed by connecting the instrument to a PC on which the MCE Link configuration software is installed or by directly using the four buttons on the front of the converter To ac...

Страница 56: ...tral area see 2 Fig 89 contains a linear graph of the flow rate expressed as a percentage of the full scale The bottom area see 3 Fig 44 can be selected by the client and possible options are T total...

Страница 57: ...rst level items of the converter configuration menu MENU PREFERENCES COUNTERS PARAMETERS I O OTHER MEMORY Every first level item allows access to their own submenu The complete menu of the AVAILABLE F...

Страница 58: ...klight level Backlight off LCD contast VIEW OPTIONS Last line PRESSURE ZERO TAG FULL SCALE FLOW RATE LANGUAGE COUNTERS See Par 7 3 2 T P ZERO SET UP T P ZERO SET UP PARAMETERS See Par 7 3 3 KA ADJUSTM...

Страница 59: ...Max min flow rate threshold Dosing Excitation failure Empty pipe All alarms PROGRAM INPUT Enabled disabled Resetting p Resetting p Resetting p p P reset and block BATCHING PROGRAMMABLE OUTPUT LOGIC O...

Страница 60: ...unit Allows you to change wanted temperature unit MEASURE INTERVAL Measuring time Valid only for battery powered versions allows you to select the measuring time of the system among 10 15 30 45 60 120...

Страница 61: ...main screen FUL SCALE FLOW RATE Allows you to change the full scale flow rate The standard full scale flow rate is calculated by considering a speed of 10 m s Here below you will find possible units o...

Страница 62: ...unters can be set to zero To set the counters to zero from the MAG software access the screen READ and press the button ZERO see 1 Fig 90 that refers to the partial counter that you want to reset The...

Страница 63: ...leswhichareusedtoobtaininstantaneous flow rate shown on the display and transferred to the 4 20 mA outputs and frequency To increase the stability increase the value in this sub menu Bypass A value ex...

Страница 64: ...e on the full scale value This value is factory disabled Selectable range starts from a minimum threshold of 5 up to 100 of the full scale value To disable the feature select 100 Min flow rate It allo...

Страница 65: ...value of Vp must be chosen so that the result is always Tp 0 001s On battery powered version High pulse frequency will affect the battery life Calculation of the parameters values must be reconsidered...

Страница 66: ...p Resetting p Resetting p p P resetting and block If the programmable output is set to dosing the programmable input will be the same and automatically used in the option dosing and it cannot be chang...

Страница 67: ...se output to any connected device system When the flow simulator is being used the counter values are not increased COMMUNICATIONS Baud rate RS485 Allows for the adjustment of the RS485 baud rate in a...

Страница 68: ...ximum 120 minutes In battery powered MAG versions priority is determined by measurement interval LOGGING MEASUREMENT To read and change information stored in the memory in the program of the MAG conve...

Страница 69: ...ontal scroll key between 1 and 120 minutes see 8 Fig 93 to change the storage time interval Click on Write see 9 Fig 93 to apply the new data and make the change effective After reading the data selec...

Страница 70: ...brations can loosen the cable glands over time so they must be checked controlled more frequently than converters that are installed in closed environments and or protected from external stresses CHEC...

Страница 71: ...inserting the 5 ways connector see 3 Fig 96 to the relative counterpart 3 Insert completely the battery pack see 1 Fig 97 inside the appropriate housing of the converter see 2 Fig 97 Make sure that t...

Страница 72: ...liquid is too low or it is not compatible with the material used for the sensor electrodes Check which electrode type is used on the sensor If necessary replace electrodes and or sensor Calibration m...

Страница 73: ...on the pipe to avoid the presence of air in the pipe Caused by ELECTRIC failure Grounding missing or performed improperly oxidized nodes very noisy ground point usually in common with the grounding s...

Страница 74: ...nverter Check if the sensors has been installed correctly and if there is an air inside the pipe Make sure that the sensor and converter are properly grounded In case of remote configuration check for...

Страница 75: ...its disposal Disposal of the device is the responsibility of the user who must comply with the specific laws enforced in the country of installation regarding environmental protection MANUFACTURER S S...

Страница 76: ...r Manual v2 0 MAG CONTACT INFO B METERS srl Via Friuli 3 Gonars 33050 UD ITALY Tel 39 0432 931415 Fax 39 0432 992661 E mail sales info info bmeters com E mail support ticket bmeters com Web www bmeter...

Отзывы: