Chapter 2: Installation
9
Chapter 2: Installation
Getting Started
Before installing your SPC, refer to the following lists to ensure that you have
all the items that shipped with the SPC as well as all other items necessary
for proper installation.
Supplied with the SPC
Your SPC package contains the following items:
•
SPC unit
•
Separate power cord - 230V units only
•
RJ-45 cable
•
Mounting bracket hardware: two mounting brackets and four sets of
screws, washers and nuts
•
RJ-45-to-DB9F-DCE serial port adaptor (used by service personnel)
•
8 (SPC800) or 16 (SPC1600) port retention clips
•
SPC Installer/User Guide
Items needed for installation
•
Phillips screwdriver
•
Screws, washers and nuts to attach the SPC to your rack
Component Overview
Figure 2.1 shows portions of a 115V SPC.
The RJ-45 serial port is used for the cable connection to your CPS.
The
Input Current
digital LED indicates the total cumulative load in amperes (A)
of all the devices attached to the SPC ports. The LED readout increases in 0.5A
increments up to 9.5A. Above 10A, the LED increases in 1.0A increments. All
SPC models indicate an overload by displaying
oL
at 30.5A, which is the
maximum rating of the SPC unit without considering the capacity of the cord set.
The SPC800 has 8 power output connectors, which are called ports. The
SPC1600 has 16 ports. Each port supplies power to an attached device, and can
be individually turned on and off. See the port specifications in
Appendix B
for
more information.
An LED, located above the upper left corner of each port, will illuminate when
that port is powered.
Содержание SPC 800
Страница 1: ...Installer User Guide SPC800 1600...
Страница 6: ......
Страница 7: ...Contents 1 Product Overview Features and Benefits 3 Safety Precautions 4...
Страница 8: ......
Страница 14: ......
Страница 20: ......
Страница 44: ...38 SPC Installer User Guide...
Страница 46: ......