92
FLSC 05 w/FLI 225 Instrument Service Manual
You can install the kit without removing the carriage from the forklift but you may find it
easier if the scale carriage is removed. Follow these steps to install the FLW 100 option.
1.
Remove the cable egress guard by removing the bolts shown in figure 10.18.
Figure 10.18 Bolts to remove
2.
Remove the junction box guard by removing the bolts pointed out in figure
10.18.
3.
Remove the junction box retainer plate bolts, shown in figure 10.19, and
remove the retainer plate.
Figure 10.19 Junction box retainer plate and bolts
4.
Disconnect the interface cable from the junction box and from the back of the
FLI 225.
5.
Clip all cable ties and remove the interface cable from the forklift.
Cable egress guard
bolts, 7/16”
Jbox guard bolts,
7/16” (recessed)
Содержание FLI 225
Страница 10: ...10 FLSC 05 w FLI 225 Instrument Service Manual ...
Страница 11: ...FLSC 05 w FLI 225 Instrument Service Manual 11 1 FCC and EMC Declarations of compliance ...
Страница 70: ...70 FLSC 05 w FLI 225 Instrument Service Manual Chart of ASCII Characters ...
Страница 104: ...104 FLSC 05 w FLI 225 Instrument Service Manual 11 3 Exploded View of FLSC 05 Carriage Assembly ...
Страница 106: ...106 FLSC 05 w FLI 225 Instrument Service Manual 11 5 Exploded View of FLI 225 AWT05 500348 ...
Страница 109: ......