
DEFINITY Enterprise Communication Server Release 9
Installation and Maintenance for Survivable Remote EPN
555-233-121
Issue 2
November 2000
SREPN Installation
1-27
Replace EPN circuit packs and make cable connections
1
Figure 1-11.
EPN DS1CONV critical reliability cable connections
Figure Notes
1. MCC cabinet
2. EPN carrier B
3. EPN carrier A
4. DS1 cables from Port Network Connectivity
(PNC) A and B links
5. DS1CONV 2-ft (61 cm) Y cable (Tie wrap the
cable to the cabinet.)
6. 9823A transceiver
7. 9823A transceiver on the EI connector
8. B25A 25-pair cable
9. Fiber optic cables
10. From the EPN B TX and RX
connectors on the rear of the SRP
11. Main Distribution Frame (MDF)
12. From the EPN A TX and RX
connectors on the rear of the SRP
13. From the PPN A TX and RX
connectors on the rear of the SRP
14. From the PPN B TX and RX
connectors on the rear of the SRP
2
4
5
RX
TX
cydfhdsa RPY 030698
1
10
12
13
14
4
5
6
7
7
8
9
9
7
4
5
RX
TX
6
2
3
9
9
11