
DEFINITY Enterprise Communication Server Release 9
Installation and Maintenance for Survivable Remote EPN
555-233-121
Issue 2
November 2000
SREPN Installation
1-9
Install the SRP cabinet
1
Install ground plates
Ground plates are installed between stacked cabinets, provide the ground
connection between cabinets, provide radio frequency (RF) radiation protection,
and help stabilize the cabinets.
Install rear ground plates (Systems with
earthquake protection)
1. Loosen the four screws at the bottom of the top cabinet and at the top of
the cabinet underneath the top cabinet. See
Figure 1-2 on page 1-8
.
2. Align the mounting holes in the rear ground plate over the bottom screws in
Figure 1-3 on page 1-10
.
3. Align the mounting holes in the ground plate with the four holes at the top
of the cabinet below the top cabinet. Slide the mounting plate down to seat
on the screws.
4. Do not tighten the screws yet.
Install front ground plates (Systems with
radiation shielding and earthquake protection)
Use the front ground plate instead of the cabinet clip to attach the cabinets to
each other. Use one front ground plate between two
stacked
cabinets.
1. At the front of the cabinets, align the holes in the top of the front ground
plate with the holes at the bottom of the upper cabinet, and insert the four
screws. Do not tighten the screws yet. See
Figure 1-3 on page 1-10
.
2. At the front of the cabinets, align the holes in the bottom of the front ground
plate with the holes at the top of the lower cabinet. Insert the four supplied
#12-24 x 1/2-inch (1.27 cm) thread-forming screws.
3. Tighten all screws securely.