• c--thumb screw
• d--battery pack
• e--guides
• f--thumb screw nut
• g--power cord
• h--power cord receptacle
• i--tripod
Figure 56: Deployment tool battery details
Assembling the deployment tool
1. Set up the tripod.
Remove the tripod from the carrying case and place it upright. Lock the casters.
2. If required, install the extension arm fitting on the tripod. If not required, go to step
4.
3. If required, secure the extension arm fitting.
Use the Allen key attached to the extender arm to secure the extension arm fitting
Allen screw.
4. Mount the extension arm on the tripod.
Place the brass end of the extension arm into the fitting, so that the keying hole of
the extension arm mates with the retaining thump screw locking device of the tripod
Prepare the tool for deployment
SIP DECT Fundamentals
October 2012 211
Содержание CS 1000
Страница 1: ...SIP DECT Fundamentals Avaya Communication Server 1000 7 5 NN43120 123 Standard 04 06 October 2012 ...
Страница 6: ...6 SIP DECT Fundamentals October 2012 ...
Страница 74: ...Site planning and hardware deployment 74 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 146: ...System administration 146 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 160: ... Show Seen DAPs System maintenance 160 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 174: ...System maintenance 174 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 182: ...G 729 daughterboard and DAP wall mounting 182 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 204: ...Site survey example 204 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 266: ...DAP multicast group membership 266 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...