Figure 38: Light conductor for LEDs
Now the 4720 DAP Printed Wiring Board (PWB) and the G.729 Daughter Board are
separate items.
4. Remove the protection foil from the sticky part on the G.729 Daughter Board.
Figure 39: G.729 Daughter Board with sticky foam
5. Mount the G.729 Daughter Board onto the main PWB. Push the Daughter Board
carefully onto the main board. The white connector should fit well. Ensure the
adhesive portion sticks to the Main Board.
G.729 daughterboard and DAP wall mounting
176 SIP DECT Fundamentals
October 2012
Содержание CS 1000
Страница 1: ...SIP DECT Fundamentals Avaya Communication Server 1000 7 5 NN43120 123 Standard 04 06 October 2012 ...
Страница 6: ...6 SIP DECT Fundamentals October 2012 ...
Страница 74: ...Site planning and hardware deployment 74 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 146: ...System administration 146 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 160: ... Show Seen DAPs System maintenance 160 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 174: ...System maintenance 174 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 182: ...G 729 daughterboard and DAP wall mounting 182 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 204: ...Site survey example 204 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 266: ...DAP multicast group membership 266 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...