• Fire resistant doors.
• A wall of steel cabinets, large computer equipment or machinery.
• Thick concrete floors.
During the site survey, be aware of the following:
• Choose a corridor or other large open space, rather than an enclosed area, so that the
radio signal passes through as few walls as possible to reach as large an area as
possible.
• Radio reception inside a vehicle is poor unless the user is close to the DAP.
• Ensure that the DAP is placed high enough to be unaffected by surrounding objects. For
example, a DAP in a car park needs to be placed higher than a vehicle that is parked next
to it.
• Ensure that DAPs are separated by at least 1 meter.
• The presence of another unsynchronised DECT System, or any similar system in adjacent
buildings, causes interference.
• A DAP or a DECT Handset interferes with sensitive laboratory equipment and medical
equipment (for example, ensure that DAPs are installed outside of an operating room at
an hospital.)
• Ensure that significant interference from unsuppressed engines or electric motors is
accounted for.
Traffic density calculations
Perform the traffic density calculations so that you have a low blocking probability in the
system.
For traffic calculations, you must know
• the number of users
• the type of users
The following table lists the three user types.
Table 3: Three user types
Traffic
Application
Erlang/User
Low
normal offices
0.05
Average
Executive and secretary groups
0.1-0.15
High
help desks, Tele-services
0.2-0.25
Site planning
SIP DECT Fundamentals
October 2012 39
Содержание CS 1000
Страница 1: ...SIP DECT Fundamentals Avaya Communication Server 1000 7 5 NN43120 123 Standard 04 06 October 2012 ...
Страница 6: ...6 SIP DECT Fundamentals October 2012 ...
Страница 74: ...Site planning and hardware deployment 74 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 146: ...System administration 146 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 160: ... Show Seen DAPs System maintenance 160 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 174: ...System maintenance 174 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 182: ...G 729 daughterboard and DAP wall mounting 182 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 204: ...Site survey example 204 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Страница 266: ...DAP multicast group membership 266 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...