background image

 

 
 

M

AINTENANCE 

I

NSTRUCTIONS  

VI.   MANUAL OPERATION  

 

 

 

 

 

A.  Your VPL gate is easily operated manually in the event of total power or component failure.   

      

1.  Turn main power switches off (both A/C & D/C). 
 
2.  Release the belt tension lever located under the gear motor to remove the belt tension.  
 
3.  Position yourself in front of operator and lift up on Linkage Arm at the pivot point 1”-2”. (See 
dwg. #103). 
 
4.  Walk out to end of gate and lift gate to the open position.  

NOTE:  

It only takes 16 - 30 lb. of force to open gate.  If more is required, contact your 

dealer or factory.  

 

5.  Place the T/M pin through the bracket holes to prevent the gate from lowering. 

 

6.  Secure the belt tension lever in the locked position to re-apply tension to the belts. 

 
 

VII.  MAINTENANCE 

 

The Basic electric and mechanical systems require only minimum routine maintenance.  The following 
items should be checked and serviced periodically depending on amount of use. (See Dwg. #103 for 
lube locations).  

 

 

 

 

ITEM RECOMMENDED 

MAINTENANCE 

Grease pivot pins on Linkage Assembly 
   (“LUBRIPLATE ‘R’ LOW TEMP” Grease) 

10,000 cycles or 6 months

Grease all bearings (2) Operator Arm, (2) Bullwheel Shaft 

every 6 months 

Grease Chain Tension Bolt and Lube Chain 

every 6 months 

Check belts for wear and tightness 
(Belt flex is 1/4” – 1/2” top & bottom between output sheave & 
bullwheel) 

every 6 months 

Check battery water level, use distilled water only 
(Not required on maintenance-free) 

every 6 months 

Clean snow/ice off of gate 
(Bal. Correctly, gate will temporarily tolerate an add’l 10 lb. of 
wt.) 

as needed 

Clean lenses on Photocells or Reflectors 

as needed 

Lubricate (Graphite Oil) all lock cylinders 

every 6 months 

Check and verify proper operation of all 

secondary

 entrapment 

devices. 

every month 
 

Check and verify proper operation of all 

primary

 reversing 

feature. (see Section V, Item #2-A) 

every week 

 

 

1.800.944.4283 AutoGate Technical Support 

 

19 

Содержание VPL-24/UL

Страница 1: ...INSTALLATION AND INSTRUCTION MANUAL VPL 24 UL 7306 Driver Road P O Box 50 Berlin Heights OH 44814 1 800 944 4283 Fax 419 588 3514 www AutoGate com...

Страница 2: ...ATION 8 INSTALLATION SITE PREP 9 INSTALLATION TOOLS AND EQUIPMENT 9 INSTALLATION RECEIVING YOUR VPL GATE AND OPERATOR 10 INSTALLATION INSTALLING YOUR VPL GATE AND OPERATOR 10 INSTALLATION OPERATOR WIR...

Страница 3: ...r monthly The gate MUST reverse on contact with a rigid object or stop when an object activates the non contact sensors After adjusting the force or the limit of travel reset the gate operator Failure...

Страница 4: ...ARE ALL ACTUATING CONTROLS LOCATED FAR OUT OF REACH OF GATE REQUIRED ____ IS THIS CLASS OPERATOR APPROVED FOR THE APPLICATION OF THE OPERATOR CLASS 1 2 3 4 REQUIRED ____ ARE CONTROLS TO RESET GATE AF...

Страница 5: ...POSE ENTRAPMENT RISK CUSTOMER ADVISED THAT GATE IS FOR VEHICULAR TRAFFIC ONLY REQUIRED A SEPARATE PEDESTRIAN ENTRY AND OR EXIT IS PROVIDED REQUIRED GATE GUARD INSTALLED ON BACK SIDE OF OPERATOR REQUI...

Страница 6: ...e or more single family units hotel garages retail store or other buildings servicing the general public CLASS III INDUSTRIAL LIMITED ACCESS VEHICULAR GATE OPERATOR A vehicular gate operator or system...

Страница 7: ...COMMAND IS RECEIVED OR WILL CLOSE BY TIMER AFTER NEW INPUT IS RECEIVED IN ORDER FOR THE GATE TO CLOSE BY TIMER IF ACTIVATED A NEW INPUT ON TERMINALS J5 1 8 MUST BE GIVEN IF AN INPUT STILL PRESENT WHEN...

Страница 8: ...ALLEN BRADLEY MODEL 60 2728 RETRO REFLECTIVE TYPE 3 OMRON MMTC MODEL E3K R10K4 NR RETRO REFLECTIVE TYPE SAFETY EDGES CONTACT EDGES 1 MILLER EDGE MODEL MU 22 MG 020 ME 123 MC 22 ME 113 ME 120 ME 020 2...

Страница 9: ...to eliminate ALL hazards MUST be taken before the unit can be put into operation You MUST advise and warn your customer of any hazards that remain or if they choose not to use any of the recommended r...

Страница 10: ...OTE All pads need to be level and smooth for ease of installation NOTE Refer to Dwg 101 for all applicable conduit locations II RECOMMENDED INSTALLATION TOOLS AND EQUIPMENT FOR INSTALLING GATE OPERATO...

Страница 11: ...cket will be enclosed inside your operator 6 Unpack Gate Box in the same careful manner V INSTALLING YOUR VERTICAL PIVOT LIFT VPL GATE AND OPERATOR WARNING DO NOT REMOVE THE T M SAFETY PIN UNTIL THE G...

Страница 12: ...so the end of the Gate is centered over the Yoke pad Allow a minimum 3 from edge of pad to bolt holes to prevent concrete damage See Dwg 101 102 2 Position and align Pad Yoke and center under gate Se...

Страница 13: ...NOT FIT IN THE OUTLET CONTACT A QUALIFIED ELECTRICIAN TO INSTALL THE PROPER OUTLET DO NOT CHANGE THE PLUG IN ANY WAY 1 Turn Off DC power 2 Wire incoming AC power to the 4 x 4 Box provided and turn on...

Страница 14: ...0 944 4283 AutoGate Technical Support 13 C Testing 1 Remove T M Safety Pin from front of Operator and hang it on the hook provided inside access door NOTE It may be necessary to push down on end of ga...

Страница 15: ...ONS on page 21 For example to test the Safety Reversing Beam interrupt the beam when the gate is on the way down The gate should stop and reverse when the beam has been broken or interrupted Do the sa...

Страница 16: ...d you MUST install vehicle and pedestrian detection devices It is strongly recommended that photoelectric beams eyes be installed on BOTH sides of the gate to reduce the possibility of injury to perso...

Страница 17: ...ager Interface For full logical interface of AutoGate VPL to a barrier gate will require only two wires from the VPL gate control panel to the barrier Run two wires from the VPL panel NO and COMMON te...

Страница 18: ...hree wires will run between gates 1 800 944 4283 AutoGate Technical Support 17 EXAMPLE SLAVE J5 MASTER J5 C If it is required that if one gate senses an obstruction the other reverses also then 3 addi...

Страница 19: ...WILL NOT OPEN Check for AC power loss at D14 check AC power switch and that batteries are fully charged Check fuses and if inputs are wired correctly test S3 manual open switch D GATE DEAD NO OPERATI...

Страница 20: ...owing items should be checked and serviced periodically depending on amount of use See Dwg 103 for lube locations ITEM RECOMMENDED MAINTENANCE Grease pivot pins on Linkage Assembly LUBRIPLATE R LOW TE...

Страница 21: ...of the Slide Assy Angle on the Threaded Rod If the gate Amps are too high in the OPEN mode move the Slide Assy UP to help it OPEN This is the most common adj Made If the gate is flying open and strug...

Страница 22: ...ion 1 Verify voltage compatibility 24 VDC is required 2 Connect signal wire N O normally open to terminal 5 on your control board 3 Connect the ground wire to terminal 9 10 11 or 12 commons 4 Connect...

Страница 23: ...ns for complete wiring 2 Run the power wires to Terminal Strip main power and 3 The N O Common signal wires to open the gate need to be attached to the Circuit Board s 1 2 or 3 Open 9 10 11 or 12 Comm...

Страница 24: ...CONTACT INFORMATION AutoGate Inc 7306 Driver Road P O Box 50 Berlin Heights OH 44814 PH 1 800 944 4283 FAX 419 588 3514 www AutoGate com 1 800 944 4283 AutoGate Technical Support 23...

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ......

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ......

Страница 37: ......

Страница 38: ......

Страница 39: ......

Страница 40: ......

Страница 41: ......

Страница 42: ......

Страница 43: ......

Страница 44: ......

Страница 45: ...n 4 Battery shelf 5 Operator arm 6 Spring assembly 7 Bullwheel belt system 8 Gear motor 9 Belt tension release 10 AC input outlet box SLIDE ASSEMBLY Slide Assembly Detail 1 Spring chain connector 2 Ad...

Страница 46: ...ccessory inputs 4 Control board 5 Accessory power strip 6 Cycle counter 7 Pushbutton ON OFF switch 8 DC main power ON OFF switch 9 Amp meter 10 Surge board 2 4 5 6 7 8 Indicating Lights Heavy Duty Loc...

Отзывы: