background image

 
 

M

AINTENANCE 

I

NSTRUCTIONS 

 
 
 

 

 
A. Balancing a Gate: 
 

Four months after installation, then annually.  It is recommended to check the balance of your VPL 
Operator.  It is mandatory to re-check the balance if you change spring(s).   You can monitor it on the 
amp meter installed on the control box door.  It is recommended to follow the instructions below for 
accurate balancing numbers using a commercial grade AMP meter. 

 

1.  Remove the wire nut on the 

RED

 motor lead and hook up one Amp Meter lead to the 

RED

 

wire and the other Amp Meter lead to the 

ORANGE

 wire.  Cycle the gate up and down and 

record the highest amp reading in both directions (reading should be in the 2.0 to 6.0 range).  
The highest reading for both the up and down cycles should be very close to the same.  If not, 
you will have to adjust the SLIDE ASSY. (see Dwg. # 107). 

 

2.  Loosen the 1 1/8” nuts on either side of the Slide Assy. Angle on the Threaded Rod. 

 If the 

gate Amps are too high in the OPEN mode, move the Slide Assy. UP to help it OPEN

.  (This is 

the most common adj. Made).  

If the gate is flying open and struggling to close, move the Slide 

Assy. DOWN.

  Only adjust the Slide Assy. 1/4” (3 to 4 turns) at a time when adjusting.  After 

each adjustment, check your amp readings. 

 

3.  When you have the gate back in balance (within a half amp (.5) is minimal), tighten both nuts 
on Slide Assembly threaded rod.  

 

B. Board Replacement 

 

1.  Turn ALL power off 

(AC & DC)

 to the board. 

 

2.  Remove (slide off) J2 “Open & Close” Limit Switch Terminal strip. 

 

3.  Remove (slide off) Accessories 1 through 12 Terminal strip. 

 

4.  Carefully remove the wires for the 24vdc Acc. Power, Battery Power, AC Power & Motor wires. 

 

5.  Take the board off the Standoffs and remove the (2) mounting bolts and replace with your NEW 
circuit board and put all wires & connections back in the same place. 
 
6.  Double check the D.I.P. switch settings to be sure they are the same as your original board. 
 

 

 
 
 
 
 
 
 

1.800.944.4283 AutoGate Technical Support 

 

20 

Содержание VPL-24/UL

Страница 1: ...INSTALLATION AND INSTRUCTION MANUAL VPL 24 UL 7306 Driver Road P O Box 50 Berlin Heights OH 44814 1 800 944 4283 Fax 419 588 3514 www AutoGate com...

Страница 2: ...ATION 8 INSTALLATION SITE PREP 9 INSTALLATION TOOLS AND EQUIPMENT 9 INSTALLATION RECEIVING YOUR VPL GATE AND OPERATOR 10 INSTALLATION INSTALLING YOUR VPL GATE AND OPERATOR 10 INSTALLATION OPERATOR WIR...

Страница 3: ...r monthly The gate MUST reverse on contact with a rigid object or stop when an object activates the non contact sensors After adjusting the force or the limit of travel reset the gate operator Failure...

Страница 4: ...ARE ALL ACTUATING CONTROLS LOCATED FAR OUT OF REACH OF GATE REQUIRED ____ IS THIS CLASS OPERATOR APPROVED FOR THE APPLICATION OF THE OPERATOR CLASS 1 2 3 4 REQUIRED ____ ARE CONTROLS TO RESET GATE AF...

Страница 5: ...POSE ENTRAPMENT RISK CUSTOMER ADVISED THAT GATE IS FOR VEHICULAR TRAFFIC ONLY REQUIRED A SEPARATE PEDESTRIAN ENTRY AND OR EXIT IS PROVIDED REQUIRED GATE GUARD INSTALLED ON BACK SIDE OF OPERATOR REQUI...

Страница 6: ...e or more single family units hotel garages retail store or other buildings servicing the general public CLASS III INDUSTRIAL LIMITED ACCESS VEHICULAR GATE OPERATOR A vehicular gate operator or system...

Страница 7: ...COMMAND IS RECEIVED OR WILL CLOSE BY TIMER AFTER NEW INPUT IS RECEIVED IN ORDER FOR THE GATE TO CLOSE BY TIMER IF ACTIVATED A NEW INPUT ON TERMINALS J5 1 8 MUST BE GIVEN IF AN INPUT STILL PRESENT WHEN...

Страница 8: ...ALLEN BRADLEY MODEL 60 2728 RETRO REFLECTIVE TYPE 3 OMRON MMTC MODEL E3K R10K4 NR RETRO REFLECTIVE TYPE SAFETY EDGES CONTACT EDGES 1 MILLER EDGE MODEL MU 22 MG 020 ME 123 MC 22 ME 113 ME 120 ME 020 2...

Страница 9: ...to eliminate ALL hazards MUST be taken before the unit can be put into operation You MUST advise and warn your customer of any hazards that remain or if they choose not to use any of the recommended r...

Страница 10: ...OTE All pads need to be level and smooth for ease of installation NOTE Refer to Dwg 101 for all applicable conduit locations II RECOMMENDED INSTALLATION TOOLS AND EQUIPMENT FOR INSTALLING GATE OPERATO...

Страница 11: ...cket will be enclosed inside your operator 6 Unpack Gate Box in the same careful manner V INSTALLING YOUR VERTICAL PIVOT LIFT VPL GATE AND OPERATOR WARNING DO NOT REMOVE THE T M SAFETY PIN UNTIL THE G...

Страница 12: ...so the end of the Gate is centered over the Yoke pad Allow a minimum 3 from edge of pad to bolt holes to prevent concrete damage See Dwg 101 102 2 Position and align Pad Yoke and center under gate Se...

Страница 13: ...NOT FIT IN THE OUTLET CONTACT A QUALIFIED ELECTRICIAN TO INSTALL THE PROPER OUTLET DO NOT CHANGE THE PLUG IN ANY WAY 1 Turn Off DC power 2 Wire incoming AC power to the 4 x 4 Box provided and turn on...

Страница 14: ...0 944 4283 AutoGate Technical Support 13 C Testing 1 Remove T M Safety Pin from front of Operator and hang it on the hook provided inside access door NOTE It may be necessary to push down on end of ga...

Страница 15: ...ONS on page 21 For example to test the Safety Reversing Beam interrupt the beam when the gate is on the way down The gate should stop and reverse when the beam has been broken or interrupted Do the sa...

Страница 16: ...d you MUST install vehicle and pedestrian detection devices It is strongly recommended that photoelectric beams eyes be installed on BOTH sides of the gate to reduce the possibility of injury to perso...

Страница 17: ...ager Interface For full logical interface of AutoGate VPL to a barrier gate will require only two wires from the VPL gate control panel to the barrier Run two wires from the VPL panel NO and COMMON te...

Страница 18: ...hree wires will run between gates 1 800 944 4283 AutoGate Technical Support 17 EXAMPLE SLAVE J5 MASTER J5 C If it is required that if one gate senses an obstruction the other reverses also then 3 addi...

Страница 19: ...WILL NOT OPEN Check for AC power loss at D14 check AC power switch and that batteries are fully charged Check fuses and if inputs are wired correctly test S3 manual open switch D GATE DEAD NO OPERATI...

Страница 20: ...owing items should be checked and serviced periodically depending on amount of use See Dwg 103 for lube locations ITEM RECOMMENDED MAINTENANCE Grease pivot pins on Linkage Assembly LUBRIPLATE R LOW TE...

Страница 21: ...of the Slide Assy Angle on the Threaded Rod If the gate Amps are too high in the OPEN mode move the Slide Assy UP to help it OPEN This is the most common adj Made If the gate is flying open and strug...

Страница 22: ...ion 1 Verify voltage compatibility 24 VDC is required 2 Connect signal wire N O normally open to terminal 5 on your control board 3 Connect the ground wire to terminal 9 10 11 or 12 commons 4 Connect...

Страница 23: ...ns for complete wiring 2 Run the power wires to Terminal Strip main power and 3 The N O Common signal wires to open the gate need to be attached to the Circuit Board s 1 2 or 3 Open 9 10 11 or 12 Comm...

Страница 24: ...CONTACT INFORMATION AutoGate Inc 7306 Driver Road P O Box 50 Berlin Heights OH 44814 PH 1 800 944 4283 FAX 419 588 3514 www AutoGate com 1 800 944 4283 AutoGate Technical Support 23...

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ......

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ......

Страница 37: ......

Страница 38: ......

Страница 39: ......

Страница 40: ......

Страница 41: ......

Страница 42: ......

Страница 43: ......

Страница 44: ......

Страница 45: ...n 4 Battery shelf 5 Operator arm 6 Spring assembly 7 Bullwheel belt system 8 Gear motor 9 Belt tension release 10 AC input outlet box SLIDE ASSEMBLY Slide Assembly Detail 1 Spring chain connector 2 Ad...

Страница 46: ...ccessory inputs 4 Control board 5 Accessory power strip 6 Cycle counter 7 Pushbutton ON OFF switch 8 DC main power ON OFF switch 9 Amp meter 10 Surge board 2 4 5 6 7 8 Indicating Lights Heavy Duty Loc...

Отзывы: