Assembly Instruction
KS2 / KS2 T
WIN
I
NSTALLATION
STEP
7
B
:
D
RIVE
MOUNTED
ON
THE
WINDOW
AT
THE
TOP
F
IXED
ASSEMBLY
WITH
Z-
FRAME
BRACKET
05
I
NSTALLATION
STEP
7
B
:
F
IXED
ASSEMBLY
WITH
Z-
FRAME
BRACKET
Cable on casement
Cable in glazing bead
Connection cable routing on the casement:
• Cable must be protected against damage (shearing-off, kinking,
splitting), i.e. by using bushings.
Upon removal of the glazing bead is the dan-
ger that the glass may fall.
Route cable on or in the casement.
Cable crossover without
protective cable hose
Cable crossover with
protective cable hose
Connection cable routing on the hinge side:
• Make sure that during opening or closing procedure the cable will
not be damaged by shearing-off, kinking, crushing.
•
Protect cable feedthrough in profi le e.g. by using cable bushings,
cable transitions.
RA
RA
FL
BD protective cable
hose
BD
AK
FL
RA
RA
FL
FL
Cable duct glued on
(in addition secured with
countersunk screws against
breaking away).
Drill hole in glazing bead
(cable bushing protects against
damage to cable).
Screw Z-frame bracket (F95 / F120) onto casement.
If necessary, use washers.
Produce drill holes with appropriate cross-section.
For the mounting dimensions please refer to the
above-mentioned hole layout drawings (see chapter
„I
NSTALLATIONSTEP
3 - 5“) or project-specifi c documents
and drawings).
Screw drive onto window frame.
Make sure they are parallel to casement edge.
The drive body must lie completely fl ush on
the window frame surface.
Secure chain in the casement bracket:
- with screw and nut or
- with spring pin. Insert spring pin from the rigid-
backed side of the chain (label side) and snap into
place.
M5
SW 2,5
SW 5,5
M5
230V
24V
Connect control voltage (e.g. using a tester) and move
out the chain approx. 100 mm.
N
OTE
With tandem / triple operation actuate all
drives together.
Check swiveling area (see chapter „S
AFETY
C
HECK
AND
P
ERFORMING
TEST
RUN
“)
parallel
rigid-backed side of chain
snap into place
Note the soft run mode at drives with
(see chapter „I
NSTALLATION
STEP
7
A
“).
S12
F95 /
F120