Assembly Instruction
KS2 / KS2 T
WIN
I
NSTALLATION
STEP
5:
H
OLE
LAYOUT
FOR
FRAME
AND
CASEMENT
BRACKETS
05
Tandem application KS2 xxx / Combination right / left
24V
(Bottom-hung - inward opening windows)
24V
H
OLE
LAYOUT
FOR
THE
FRAME
BRACKETS
F120 / F95
(
DRIVE
AT
SIDE
)
I
NSTALLATION
STEP
5
M
:
X
FAH min.:
min.
strok
e
Window
Stroke
A
B
X
Max.
opening
200
335
325
≥ 380
45
300
380
370
≥ 470
50
400
430
420
≥ 570
60
500
545
535
≥ 800
60
600
545
535
≥ 800
60
800
625
615
≥ 960
60
A
F120
section:
see below
AK
AK
BD
RA
FL
A
B
FAB = max. 1200
F120
F95
• only for bottom-hung casements
(inward opening windows)
• respect max. pulling forces of drives.
• cable exit (power supply) on top.
• rigid-backed side of chain upward.
• white wires must be connected.
From FAB > 1200 mm is a
locking drive required!