Assembly Instruction
KS2 / KS2 T
WIN
Solo application KS2 xxx / Version: right
Pressure load - Transom assembly
I
NSTALLATION
STEP
5:
H
OLE
LAYOUT
FOR
FRAME
AND
CASEMENT
BRACKETS
05
A
F21
K93
M5x10
Schüco FW50
DIN 7500
AK
1/2 RLB
RA
FL
C
G
B
A
K93
inward
K93
outward
F21
X
Y
= Symmetrical /
= Asymmetrical
FAB min.:
230V
Frame casement K93 inward
Stroke
200
300
400
500
A
476
521
571
686
B
490
535
585
700
C
177,5
222,5
272,5
387,5
X
≥ 570
≥ 570
≥ 570
≥ 800
Y
≥ 475
≥ 520
≥ 570
≥ 685
Frame casement K93 outward
Stroke
200
300
400
500
A
476
521
571
686
B
490
535
585
700
G
207,5
252,5
302,5
417,5
X
≥ 630
≥ 630
≥ 630
≥ 860
Y
≥ 535
≥ 580
≥ 630
≥ 745
(Top-hung - outward opening windows)
24V
230V
Minimum overall height of casement
(FAH)
Stroke
200
300
400
500
Height
350
400
450
600
Frame bracket:
Casement bracket:
Drive:
Space for console with drive: 30 mm
K93
F21
fi xed
(Top-hung - outward opening windows)
Holes above
(strips facing outward)
Holes below
(strips facing inward)
When mounting two drives (tandem operation),
a minimum distance of 50 mm between the drives
is considered.
Bottom hung - outward opening
Top hung - outward opening
Projecting top-hung casement
Skyskylight dome
Roof bottom-hung
Roof top-hung
Version: left
Window versions:
Version left (L):
as right (R), but in mirror image