background image

Installation instructions S-HR series page 21

Service chapter.
After the access code has been fed in it is possible to
temporarily manually adjust the number of revolutions
of the fan in the service chapter (table 10). In order to
select the service chapter the Mode key has to be
pressed 3 X after feeding in the access code. By means
of the Step key the first function is displayed with the text
Off. By means of the + or - key a required number of
revolutions for the fan can be selected while the boiler is
operating.
With Step 4 it is possible to activate the showroom
position by pressing the + key after which the text “on”
appears in the display.
After this a simulated water pressure of 1.9 bar and a
water temperature will be indicated. Pump or burner
action is not possible.

Error chapter.
After the access code has been fed in the Error chapter
can be read (table 11). In order to select the Error chapter
it is necessary to press the Mode key 4 X after feeding in
the access code. By means of the Step key the functions
are shown which were stored when the boiler went into an
error state. The first error which is shown is the last, the
next error is the second last, etc.

In order to return to the normal technical read out whereby
the water temperature and water pressure are shown, the
Standby chapter must be requested by means of the
Mode key. After a few seconds the text standby will be
replaced by the technical read-out.
Other wise returning to the “Good” read-out auto-
matically occurs after 20 minutes in the event that no
more keys have been used.

installer service possibilities

  

table 10

installer error possibilities

  

table 11

r

e

ll

a

t

s

n

i

e

d

o

m

r

o

r

r

E

p

e

t

S

n

o

it

p

ir

c

s

e

d

e

u

l

a

v

1

r

e

b

m

u

n

r

o

r

r

e

2

ti

n

u

s

u

t

a

t

s

g

n

it

a

r

e

p

o

3

1

T

e

r

u

t

a

r

e

p

m

e

t

r

e

t

a

w

w

o

lf

C

°

4

2

T

e

r

u

t

a

r

e

p

m

e

t

r

e

t

a

w

n

r

u

t

e

r

C

°

5

d

a

o

l

W

k

6

y

ti

c

a

p

a

c

p

m

u

p

%

r

e

ll

a

t

s

n

i

e

d

o

m

e

c

i

v

r

e

S

p

e

t

S

n

o

it

p

ir

c

s

e

d

1

n

o

n

o

it

c

n

u

f

r

e

n

r

u

b

h

ti

w

n

o

it

a

r

e

p

o

n

i

r

e

li

o

b

2

ff

o

r

e

n

r

u

b

d

n

a

e

l

b

a

t

s

u

j

d

a

n

a

f

3

n

o

r

e

n

r

u

b

h

ti

w

e

l

b

a

t

s

u

j

d

a

p

m

u

p

4

e

v

it

c

a

n

o

n

=

F

F

O

d

n

a

e

v

it

c

a

=

N

O

n

o

it

i

s

o

p

m

o

o

r

w

o

h

s

Green key function
The green key function can be used in order to activate the
factory settings. By this means the modified settings are
cancelled. The following actions must be carried out.

Make sure that chapter 

 is shown in the display by

means of the Mode key. After this press the Store key.
The word Copy becomes visible and the factory settings
will be active again.

12 Isolating the boiler

In some situations it may be that the entire boiler must be
switched off. By switching off the three keys with the
lamps for central heating, hot water and pump program,
the boiler is switched off. Leave the plug in the wall
socket, by which means the circulation pump and the
three-way valve are activated once every 24 hours in
order to prevent jamming.

In the event of frost danger it is advisable to
drain the boiler and/or the installation.

Содержание Blauwe Engel S-HR 15

Страница 1: ...INSTALLATION SERVICING INSTRUCTIONS 8G 51 28 01 04 03 We reserve the right to make changes CE PIN 0063AS3538 These instructions to be retained by user...

Страница 2: ......

Страница 3: ...oiler and installation 17 10 1 Central heating system 17 10 2 Hot water supply 17 11 Commissioning the boiler 18 11 1 Central Heating system 18 11 2 Hot water supply 18 11 3 Adjustments 18 12 Isolatin...

Страница 4: ...bers of CORGI and in accordance with the current Gas Safety Regulation Failuretoinstallappliancecorrectlycouldlead to prosecution In addition to the above regulations this appliance must be installedi...

Страница 5: ...llationorthehotwatersupply Asaresultthe boiler will adjust its capacity to the installation and will switch on less often which means that the boiler will operatelongerandatalowlevel Itispossiblethatt...

Страница 6: ...m 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 J e p i p n r u t e r e d i s t f e l m m 5 8 2 5 8 2 5 8 2 5 8 2 5 8 2 5 4 4 5 4 4 5 4 4 K e p i p n o i t a s n e d n o c e d i s t f e l m m 0 7 3...

Страница 7: ...nated testing water can be released It is advisable to spray clean all of the unit s connectingpipesand ortospray clean blow clean the installation before connecting it to the unit connection diameter...

Страница 8: ...with the boiler The electrical side of this external circulation pump can be connected in the Control Tower by which means this pump switches at the same times as the boiler pump The maximum absorbed...

Страница 9: ...rtcylinder theexpansionvessel connectionisincludedintheinternalpipingoftheComfort cylinder towhichtheexpansionvesselcanbeconnected If a different cylinder is used then one has to take into account tha...

Страница 10: ...th S HR boiler figure 7 dimensions in mm 515 wall 145 370 front view of the expansion vessel module figure6 dimensions in mm 480 660 105 6 3 Underfloorheatingsystem plasticpipes Whenconnectingorusinga...

Страница 11: ...han 1 5 bar it is advisabletoremovetheinsidemechanismofthedosing valve Connectingofthedrinkingwaterinstallationshould be done according to the national water laws 6 6 Hot water supply S HR 15 24 and 3...

Страница 12: ...i l e h t o t d e d d a e b t s u m w o l e b d e t a t s h t g n e l t n e l a v i u q e s h t g n e l e p i p d n a m m 5 2 1 0 8 t c u d t s u a h x e s e r t e m 0 1 h t i w 4 2 R H S e l p m a x...

Страница 13: ...The flue must be terminated in a place not likely to cause a nuisance Forhorizontalsections theoutletsystemshouldalways be fitted on an incline 30 mm m sloping down towards the appliance so that no co...

Страница 14: ...be designed in accordance with the enclosed regulations Should it be necessary to change it the mains power supply cable may only be replaced with an ATAG mains power supply cable item No S4407300 The...

Страница 15: ...Installation instructions S HR series page 15 electrical connecting diagram figure 11...

Страница 16: ...emperatureovershoot Onacallforhotwater supply the T set value of central heating return water temperature is monitored Depending on the amount of sanitarywaterwhichiswithdrawnfromtheDHWcylinder the ce...

Страница 17: ...al lamps off Connect the filling hose to the cold water tap and let it fill with water Connect the filled filling hose to the filling and draining valve and open this valve Open the cold water tap and...

Страница 18: ...e boiler will start the burner 11 2 Hot water supply Provided there is a heat requirement from the cylinder the hot water program will be put into operation by means of the key hot water program 11 3...

Страница 19: ...rdatacanberetrieved user adjustment possibilities table 7 s t n e m t s u j d a r e t e m a r a p r e s U p e t S n o i t p i r c s e d y r o t c a f e g n a r 1 g n i t a e h l a r t n e c p m e t r...

Страница 20: ...i m 9 4 y t i c a p a c p m u p x a m g n i t a e h l a r t n e c 0 0 1 0 0 1 0 4 9 8 e c a f r e t n i g n i t t e s s s e r d d a 0 7 1 1 e r a p s 0 n i a r B 7 0 e d a c s a C n i 8 1 r e l i o b...

Страница 21: ...Good read out auto matically occurs after 20 minutes in the event that no more keys have been used installer service possibilities table 10 installer error possibilities table 11 r e l l a t s n i e...

Страница 22: ...the following operations must be carried out in order to enter the service chapter feed in the access code as described on pages 19 21 select the manual fan setting without burner action Step by means...

Страница 23: ...t can be corrected by means of the adjustment screw on the gas block 13 3 Checking the CO2 The CO2 percentage is factory set This can be checked by means of the following actions put the boiler into o...

Страница 24: ...unit the burner ceramic bricks and the heat exchanger can be cleaned by means of a soft brush Refitting of the components is done in reverse Thefollowingcomponentsrequireextraattentionduringthe servic...

Страница 25: ...e r r e w o p c i r t c e l e y b d n a t s W 5 5 5 5 5 5 5 5 9 2 5 0 6 N E o t g n i d r o c c a n o i t c e t o r p f o e e r g e d 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I t...

Страница 26: ...only S HR 24T and 35T E1 expansion vessel pipe only S HR 51T K coldwaterpipe S HR T W hotwaterpipe S HR T T1 flowsensor T2 returnsensor T3 cylindersensorHWS S HR T T5 flue gas sensor if fitted P1 wate...

Страница 27: ...burner bricks 9 cylinderHWS S HR T 10 operatingpanel boiler description figure 17 4 2 1 3 17 5 16 7 6 T3 9 18 T2 C 11 E1 K 13 14 15 W G 19 A 10 R T5 P1 T1 11 ControlTower 12 water filter return centr...

Страница 28: ...2 expansionvessel 3 outside sensor ARV1215U 4 drainpoints 5 ATAG room thermostat 17 Example diagrams for connecting the boiler 17 1 Radiator installation without thermostat valves connecting of the b...

Страница 29: ...xpansionvessel 3 outside sensor ARV1215U 4 drainpoints 5 ATAG room thermostat 6 by pass trv thermostaticradiatorvalve 17 2 radiator installation with thermostat valves only connecting of the boiler to...

Страница 30: ...apacity Block 60 Incorrect parameter setting of the minimum or maximum power Block 67 A T has been detected between flow and return sensor whereas the burner is not in operation After the T has disapp...

Страница 31: ...Installation instructions S HR series page 31 19 CE Certificate United Kingdom...

Страница 32: ...Installation instructions S HR series page 32 20 CE Certificate Ireland...

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ...This renewed publication cancels all previous installation instructions The company reserves the right to change the specifications and dimensions without prior notice E O E...

Страница 37: ...essure is to low 0 7 bar FILL indication remains continuously visible the boiler is taken out of operation The installation needs to be topped up Water pressure is to high 2 8 bar HIGH indication rema...

Отзывы: