background image

Installation instructions S-HR series page 4

1

Introduction

These instructions describe the functioning, installation,
use and primary maintenance of ATAG central heating
units for United Kingdom and Ireland. Where necessary
different regulations of each country are separately
described.

These instructions are intended for the use of Corgi
registerd installers or registered Bord Gais installers in
connection with the installation and putting into operation
of ATAG units. It is advisable to read these instructions
thoroughly, well in advance of installation. Separate
instructions for use are supplied with the unit for users of
ATAG central heating units. ATAG is not liable for the
consequences of mistakes or shortcomings which have
found their way into the installation instructions or user’s
manual. Further, ATAG reserves the right to alter its
products without prior notification.

When delivering the unit, give the customer
clear instructions concerning its use; present
the customer with the user’s manual and card.

Each unit is fitted with an identification plate. Consult the
details on this plate to verify whether the unit is
compliant with its intended location, e.g.: gas type,
power source and exhaust classification.

On completion of the installation the installer or
commissioning engineer must fill out and complete the
Benchmark commission section of the boiler log book and
hand to customer or end user for future record keeping.
The Benchmark log book must also be filled out and
completed by the service agent following each service call,
and returned to the customer. A copy of the Benchmark
commissioning certificate must be returned to ATAG
Heating UK Ltd along with the warranty registration card to
register the appliance for the standard warranty benefits.

2

Regulations

The following regulations apply to installation of ATAG
central heating units:

Legislation and Regulations.
Gas Safety (Installation and Use). All gas appliances must
by law, be installed by a competent person, eg. Members
of CORGI and in accordance with the current Gas Safety
Regulation. Failure to install appliance correctly could lead
to prosecution.

In addition to the above regulations this appliance must be
installed in compliance with the current IEE Regulations, the
Building Standards (Scotland Consolidation) Regulations.
Regulations and bye laws of the Local Water Authority and
the Current Health and Safety Regulation.

Ireland:

-

Irish standard 813

-

Domestic gas installations

The current, Electricity at Work Regulation must be
complied with and also be in accordance with the
relevant and current editions of the British Standards.

The ATAG Blauwe Engel boiler is a certified appliance
and must not be modified or installed in any way contrary
to this Installation Manual.
Manufactures instructions  must not be taken in any way
as overriding statutory obligations.

The ATAG Blauwe Engel is a central heating unit with an
optional integrated hot water function. These units must
be connected according to these instructions and all
installation norms in respect of the part of the unit to be
connected.

Observe the following rules of safety:
-

All work on the unit must take place in a dry
environment.

-

ATAG units may never be in operation without their
housing, except in connection with maintenance or
adjustments (see Chapter 13 and 14).

-

Never allow electrical or electronic components to
come into contact with water.

Carry out the following tasks in connection with
maintenance, etc. to an already-installed unit:
-

Shut down all programmes

-

Close the gas tap

-

Remove the plug from the wall socket

-

Close the stop cock of the unit’s intake connection

Take note of the following when maintenance or
adjustments are needed:
-

The unit must be able to function during these
activities; for this reason, the unit’s supply voltage,
gas pressure and water pressure must be
maintained. Ensure that these are not a source of
potential danger during these activities.

Following maintenance or other activities;
always check the installation of all parts
through which gas flows (using leak-search
spray).

Following maintenance or other activities,
always replace the housing and secure it with
the screw behind the door at the front of the
casing.

Содержание Blauwe Engel S-HR 15

Страница 1: ...INSTALLATION SERVICING INSTRUCTIONS 8G 51 28 01 04 03 We reserve the right to make changes CE PIN 0063AS3538 These instructions to be retained by user...

Страница 2: ......

Страница 3: ...oiler and installation 17 10 1 Central heating system 17 10 2 Hot water supply 17 11 Commissioning the boiler 18 11 1 Central Heating system 18 11 2 Hot water supply 18 11 3 Adjustments 18 12 Isolatin...

Страница 4: ...bers of CORGI and in accordance with the current Gas Safety Regulation Failuretoinstallappliancecorrectlycouldlead to prosecution In addition to the above regulations this appliance must be installedi...

Страница 5: ...llationorthehotwatersupply Asaresultthe boiler will adjust its capacity to the installation and will switch on less often which means that the boiler will operatelongerandatalowlevel Itispossiblethatt...

Страница 6: ...m 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 J e p i p n r u t e r e d i s t f e l m m 5 8 2 5 8 2 5 8 2 5 8 2 5 8 2 5 4 4 5 4 4 5 4 4 K e p i p n o i t a s n e d n o c e d i s t f e l m m 0 7 3...

Страница 7: ...nated testing water can be released It is advisable to spray clean all of the unit s connectingpipesand ortospray clean blow clean the installation before connecting it to the unit connection diameter...

Страница 8: ...with the boiler The electrical side of this external circulation pump can be connected in the Control Tower by which means this pump switches at the same times as the boiler pump The maximum absorbed...

Страница 9: ...rtcylinder theexpansionvessel connectionisincludedintheinternalpipingoftheComfort cylinder towhichtheexpansionvesselcanbeconnected If a different cylinder is used then one has to take into account tha...

Страница 10: ...th S HR boiler figure 7 dimensions in mm 515 wall 145 370 front view of the expansion vessel module figure6 dimensions in mm 480 660 105 6 3 Underfloorheatingsystem plasticpipes Whenconnectingorusinga...

Страница 11: ...han 1 5 bar it is advisabletoremovetheinsidemechanismofthedosing valve Connectingofthedrinkingwaterinstallationshould be done according to the national water laws 6 6 Hot water supply S HR 15 24 and 3...

Страница 12: ...i l e h t o t d e d d a e b t s u m w o l e b d e t a t s h t g n e l t n e l a v i u q e s h t g n e l e p i p d n a m m 5 2 1 0 8 t c u d t s u a h x e s e r t e m 0 1 h t i w 4 2 R H S e l p m a x...

Страница 13: ...The flue must be terminated in a place not likely to cause a nuisance Forhorizontalsections theoutletsystemshouldalways be fitted on an incline 30 mm m sloping down towards the appliance so that no co...

Страница 14: ...be designed in accordance with the enclosed regulations Should it be necessary to change it the mains power supply cable may only be replaced with an ATAG mains power supply cable item No S4407300 The...

Страница 15: ...Installation instructions S HR series page 15 electrical connecting diagram figure 11...

Страница 16: ...emperatureovershoot Onacallforhotwater supply the T set value of central heating return water temperature is monitored Depending on the amount of sanitarywaterwhichiswithdrawnfromtheDHWcylinder the ce...

Страница 17: ...al lamps off Connect the filling hose to the cold water tap and let it fill with water Connect the filled filling hose to the filling and draining valve and open this valve Open the cold water tap and...

Страница 18: ...e boiler will start the burner 11 2 Hot water supply Provided there is a heat requirement from the cylinder the hot water program will be put into operation by means of the key hot water program 11 3...

Страница 19: ...rdatacanberetrieved user adjustment possibilities table 7 s t n e m t s u j d a r e t e m a r a p r e s U p e t S n o i t p i r c s e d y r o t c a f e g n a r 1 g n i t a e h l a r t n e c p m e t r...

Страница 20: ...i m 9 4 y t i c a p a c p m u p x a m g n i t a e h l a r t n e c 0 0 1 0 0 1 0 4 9 8 e c a f r e t n i g n i t t e s s s e r d d a 0 7 1 1 e r a p s 0 n i a r B 7 0 e d a c s a C n i 8 1 r e l i o b...

Страница 21: ...Good read out auto matically occurs after 20 minutes in the event that no more keys have been used installer service possibilities table 10 installer error possibilities table 11 r e l l a t s n i e...

Страница 22: ...the following operations must be carried out in order to enter the service chapter feed in the access code as described on pages 19 21 select the manual fan setting without burner action Step by means...

Страница 23: ...t can be corrected by means of the adjustment screw on the gas block 13 3 Checking the CO2 The CO2 percentage is factory set This can be checked by means of the following actions put the boiler into o...

Страница 24: ...unit the burner ceramic bricks and the heat exchanger can be cleaned by means of a soft brush Refitting of the components is done in reverse Thefollowingcomponentsrequireextraattentionduringthe servic...

Страница 25: ...e r r e w o p c i r t c e l e y b d n a t s W 5 5 5 5 5 5 5 5 9 2 5 0 6 N E o t g n i d r o c c a n o i t c e t o r p f o e e r g e d 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I t...

Страница 26: ...only S HR 24T and 35T E1 expansion vessel pipe only S HR 51T K coldwaterpipe S HR T W hotwaterpipe S HR T T1 flowsensor T2 returnsensor T3 cylindersensorHWS S HR T T5 flue gas sensor if fitted P1 wate...

Страница 27: ...burner bricks 9 cylinderHWS S HR T 10 operatingpanel boiler description figure 17 4 2 1 3 17 5 16 7 6 T3 9 18 T2 C 11 E1 K 13 14 15 W G 19 A 10 R T5 P1 T1 11 ControlTower 12 water filter return centr...

Страница 28: ...2 expansionvessel 3 outside sensor ARV1215U 4 drainpoints 5 ATAG room thermostat 17 Example diagrams for connecting the boiler 17 1 Radiator installation without thermostat valves connecting of the b...

Страница 29: ...xpansionvessel 3 outside sensor ARV1215U 4 drainpoints 5 ATAG room thermostat 6 by pass trv thermostaticradiatorvalve 17 2 radiator installation with thermostat valves only connecting of the boiler to...

Страница 30: ...apacity Block 60 Incorrect parameter setting of the minimum or maximum power Block 67 A T has been detected between flow and return sensor whereas the burner is not in operation After the T has disapp...

Страница 31: ...Installation instructions S HR series page 31 19 CE Certificate United Kingdom...

Страница 32: ...Installation instructions S HR series page 32 20 CE Certificate Ireland...

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ...This renewed publication cancels all previous installation instructions The company reserves the right to change the specifications and dimensions without prior notice E O E...

Страница 37: ...essure is to low 0 7 bar FILL indication remains continuously visible the boiler is taken out of operation The installation needs to be topped up Water pressure is to high 2 8 bar HIGH indication rema...

Отзывы: