background image

Installation instructions S-HR series page 5

The following (safety) symbols may be encountered in
these installation instructions and on the unit:

This symbol indicates that the unit must be
stored away from frost.

This symbol indicates that the packaging
and/or contents can be damaged as a result of
insufficient care taken during transport.

This symbol indicates that, whilst still in its
packaging, the unit must be protected from
weather conditions during transport and
storage.

KEY-symbol. This symbol indicates that
assembly or dismantling, must be carried
out.

ATTENTION symbol. This symbol indicates
that extra attention must be paid in
connection with a particular operation.

Danger: High Voltage!

3

Description of the appliance

The ATAG Blauwe Engel

 

S-HR boiler is a room sealed,

condensing and modulating central heating boiler, with
or without an integrated hot water facility.
The built-in fan sucks the combustion air from outside
and provides full premixing of the gas and air. The gas
mixture is guided through the ceramic burner which is
fitted above the heat exchanger. As a result of the small
flame height a compact construction is possible. The
combustion gasses are exhausted after passing
through the stainless steel heat exchanger. The formed
condensate water is discharged through the waste trap.

The boiler has been tested according to valid CE*
standards and has a CE* certificate and SEDBUK A-
rating.
The operating efficiency of the boiler is higher than 98%
(on upper value Hs). As a result of its compact
construction the radiation, convection and stand by
losses are very low. The emission of damaging
substances is far below the standard set for equipment
with the gas quality-control label for clean combustion.

The boiler is provided with an automatic venting program.
In case of a recently topped up or filled up installation this
program takes care of the removal of any present air in the
boiler. In this case the control will check the water
pressure and if it is to low, will report this on the display.

The boiler anticipates the heat requirement of the central
heating installation or the hot water supply. As a result the
boiler will adjust its capacity to the installation and will
switch on less often, which means that the boiler will
operate longer and at a low level. It is possible that the boiler

will only have to switch on once an hour. In this case the
aim is to obtain maximum comfort and efficiency.

In order to be able to anticipate installation heat
emissions the boiler has been fitted with a proportional
gradient control system. After the boiler goes into
operation this control provides a uniform increase of
power, instead of immediately burning at full power.
When the installation does require full power the control
will adjust as required. By this means a uniform increase
of the water temperature is effected.
If an outside sensor is connected, the control will
operate weather-dependent. This means that the
control measures the outside temperature and the flow
water temperature. On the basis of this data the control
calculates the optimal flow water temperature in the
installation.

The S-HR-T combination boiler provides a hot water
supply by means of a high output cylinder fitted on the
right hand side of the boiler. An adjustable thermostatic
mixing valve is fitted which provides a constant hot water
temperature (60°C factory setting).

4

Scope of the supply

The boiler is supplied ready for use. The supply kit is
composed as follows:
-

Boiler with casing;

-

Automatic vent (inside the boiler);

-

Safety valve (inside the boiler);

-

Suspension bracket

-

Filling and draining valve with T-piece;

-

Fixing material consisting of plugs and screws;

-

Template on the package wrapper;

-

Installation instructions

-

Operating manual;

-

Warranty card;

-

Benchmark logbook.

5

Mounting of the boiler

The boiler can be mounted practically to any wall with the
suspension bracket and the enclosed fixing equipment.
The wall must be flat and of sufficient strength in order to
be able to carry the boiler weight.
Above the boiler there must be at least 250 mm working
space in order to be able to fit a coaxial flue system or a
twin supply. On the left side of the boiler at least 50 mm
and on the right side 10 mm must be reserved in
connection with fitting or removing of the casing. The
location of the boiler can be determined by using the
template located inside the boiler packaging.

Содержание Blauwe Engel S-HR 15

Страница 1: ...INSTALLATION SERVICING INSTRUCTIONS 8G 51 28 01 04 03 We reserve the right to make changes CE PIN 0063AS3538 These instructions to be retained by user...

Страница 2: ......

Страница 3: ...oiler and installation 17 10 1 Central heating system 17 10 2 Hot water supply 17 11 Commissioning the boiler 18 11 1 Central Heating system 18 11 2 Hot water supply 18 11 3 Adjustments 18 12 Isolatin...

Страница 4: ...bers of CORGI and in accordance with the current Gas Safety Regulation Failuretoinstallappliancecorrectlycouldlead to prosecution In addition to the above regulations this appliance must be installedi...

Страница 5: ...llationorthehotwatersupply Asaresultthe boiler will adjust its capacity to the installation and will switch on less often which means that the boiler will operatelongerandatalowlevel Itispossiblethatt...

Страница 6: ...m 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 J e p i p n r u t e r e d i s t f e l m m 5 8 2 5 8 2 5 8 2 5 8 2 5 8 2 5 4 4 5 4 4 5 4 4 K e p i p n o i t a s n e d n o c e d i s t f e l m m 0 7 3...

Страница 7: ...nated testing water can be released It is advisable to spray clean all of the unit s connectingpipesand ortospray clean blow clean the installation before connecting it to the unit connection diameter...

Страница 8: ...with the boiler The electrical side of this external circulation pump can be connected in the Control Tower by which means this pump switches at the same times as the boiler pump The maximum absorbed...

Страница 9: ...rtcylinder theexpansionvessel connectionisincludedintheinternalpipingoftheComfort cylinder towhichtheexpansionvesselcanbeconnected If a different cylinder is used then one has to take into account tha...

Страница 10: ...th S HR boiler figure 7 dimensions in mm 515 wall 145 370 front view of the expansion vessel module figure6 dimensions in mm 480 660 105 6 3 Underfloorheatingsystem plasticpipes Whenconnectingorusinga...

Страница 11: ...han 1 5 bar it is advisabletoremovetheinsidemechanismofthedosing valve Connectingofthedrinkingwaterinstallationshould be done according to the national water laws 6 6 Hot water supply S HR 15 24 and 3...

Страница 12: ...i l e h t o t d e d d a e b t s u m w o l e b d e t a t s h t g n e l t n e l a v i u q e s h t g n e l e p i p d n a m m 5 2 1 0 8 t c u d t s u a h x e s e r t e m 0 1 h t i w 4 2 R H S e l p m a x...

Страница 13: ...The flue must be terminated in a place not likely to cause a nuisance Forhorizontalsections theoutletsystemshouldalways be fitted on an incline 30 mm m sloping down towards the appliance so that no co...

Страница 14: ...be designed in accordance with the enclosed regulations Should it be necessary to change it the mains power supply cable may only be replaced with an ATAG mains power supply cable item No S4407300 The...

Страница 15: ...Installation instructions S HR series page 15 electrical connecting diagram figure 11...

Страница 16: ...emperatureovershoot Onacallforhotwater supply the T set value of central heating return water temperature is monitored Depending on the amount of sanitarywaterwhichiswithdrawnfromtheDHWcylinder the ce...

Страница 17: ...al lamps off Connect the filling hose to the cold water tap and let it fill with water Connect the filled filling hose to the filling and draining valve and open this valve Open the cold water tap and...

Страница 18: ...e boiler will start the burner 11 2 Hot water supply Provided there is a heat requirement from the cylinder the hot water program will be put into operation by means of the key hot water program 11 3...

Страница 19: ...rdatacanberetrieved user adjustment possibilities table 7 s t n e m t s u j d a r e t e m a r a p r e s U p e t S n o i t p i r c s e d y r o t c a f e g n a r 1 g n i t a e h l a r t n e c p m e t r...

Страница 20: ...i m 9 4 y t i c a p a c p m u p x a m g n i t a e h l a r t n e c 0 0 1 0 0 1 0 4 9 8 e c a f r e t n i g n i t t e s s s e r d d a 0 7 1 1 e r a p s 0 n i a r B 7 0 e d a c s a C n i 8 1 r e l i o b...

Страница 21: ...Good read out auto matically occurs after 20 minutes in the event that no more keys have been used installer service possibilities table 10 installer error possibilities table 11 r e l l a t s n i e...

Страница 22: ...the following operations must be carried out in order to enter the service chapter feed in the access code as described on pages 19 21 select the manual fan setting without burner action Step by means...

Страница 23: ...t can be corrected by means of the adjustment screw on the gas block 13 3 Checking the CO2 The CO2 percentage is factory set This can be checked by means of the following actions put the boiler into o...

Страница 24: ...unit the burner ceramic bricks and the heat exchanger can be cleaned by means of a soft brush Refitting of the components is done in reverse Thefollowingcomponentsrequireextraattentionduringthe servic...

Страница 25: ...e r r e w o p c i r t c e l e y b d n a t s W 5 5 5 5 5 5 5 5 9 2 5 0 6 N E o t g n i d r o c c a n o i t c e t o r p f o e e r g e d 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I t...

Страница 26: ...only S HR 24T and 35T E1 expansion vessel pipe only S HR 51T K coldwaterpipe S HR T W hotwaterpipe S HR T T1 flowsensor T2 returnsensor T3 cylindersensorHWS S HR T T5 flue gas sensor if fitted P1 wate...

Страница 27: ...burner bricks 9 cylinderHWS S HR T 10 operatingpanel boiler description figure 17 4 2 1 3 17 5 16 7 6 T3 9 18 T2 C 11 E1 K 13 14 15 W G 19 A 10 R T5 P1 T1 11 ControlTower 12 water filter return centr...

Страница 28: ...2 expansionvessel 3 outside sensor ARV1215U 4 drainpoints 5 ATAG room thermostat 17 Example diagrams for connecting the boiler 17 1 Radiator installation without thermostat valves connecting of the b...

Страница 29: ...xpansionvessel 3 outside sensor ARV1215U 4 drainpoints 5 ATAG room thermostat 6 by pass trv thermostaticradiatorvalve 17 2 radiator installation with thermostat valves only connecting of the boiler to...

Страница 30: ...apacity Block 60 Incorrect parameter setting of the minimum or maximum power Block 67 A T has been detected between flow and return sensor whereas the burner is not in operation After the T has disapp...

Страница 31: ...Installation instructions S HR series page 31 19 CE Certificate United Kingdom...

Страница 32: ...Installation instructions S HR series page 32 20 CE Certificate Ireland...

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ...This renewed publication cancels all previous installation instructions The company reserves the right to change the specifications and dimensions without prior notice E O E...

Страница 37: ...essure is to low 0 7 bar FILL indication remains continuously visible the boiler is taken out of operation The installation needs to be topped up Water pressure is to high 2 8 bar HIGH indication rema...

Отзывы: