background image

Installation instructions S-HR series page 11

6.4

Gas connection

The appliance pipe is fitted with an internal thread, into
which the tail piece of the gas tap can be screwed.

United Kingdom:

The gas supply must comply to the current Gas Safety
Regulations.

Ireland:

-

Irish standard 813

-

Domestic gas installations

The connection to the appliance must include a suitable
method of disconnection and a gas control cock must be
installed adjacent to the appliance for isolation purposes.
The nominal inlet working gas pressure measured at the
appliance should be 20 mbar for Nat gas (G20).

Make sure that the gas pipe work does not
contain dirt, particularly with new pipes.

6.5

Hot water supply (S-HR-T)

The sanitary water pipes can be connected to the
installation by means of compression fittings.
The cold water inlet on the S-HR-T boilers must be
provided with the following (counted in the water flow
direction):
- Dosing valve (supplied);
- Safety group;
- Expansion vessel 6bar (potable water, blue).

A dosing valve must be fitted in the cold water pipe. The
dosing valve provides that a quantity of water is supplied
which has a guaranteed outlet temperature of 60°C
(assuming a cold water temperature of 10°C). The
quantity of water is virtually unaffected by the water
pressure. With a water pressure lower than 1.5 bar it is
advisable to remove the inside mechanism of the dosing
valve. Connecting of the drinking water installation should
be done according to the national water laws.

6.6

Hot water supply S-HR 15, 24 and 35

Depending of the comfort preferences different external hot
water cylinders can be connected to the boiler. The choice
of the cylinder depends on the coil output. The coil output
must comply with the boiler output. The S-HR 15, 24 and
35 are provided with an internal 3 way valve. The return pipe
of the cylinder is simply connected to the connection under
the boiler. The flow pipe of the cylinder must be connected
to a T-piece in the flow pipe of the boiler. The electrical
connection are already made on the connection terminal in
the Control Tower. Only the wire of the cylinder sensor
should be connected to the terminal. See the wiring
diagram on page 14 and 15.

By the SH-R 51 and 60 with larger cylinder pipes (coil
resistance) we recommend the use of a cylinder pump.

6.7

Condensation drain pipe

The collective condensation drain pipe should be connected
to the drain by means of an open connection. By this means
the possibility of drain gases ending up in the boiler is
prevented. The drain connection should have a minimum
diameter of 25 mm.

The following components are connected to the collective
condensation drain pipe:
-

Condensation discharge;

-

Safety valve;

Draining of the condensation water to the
external rain guttering is not permitted in
view of the danger of freezing.

Before putting the boiler into operation fill the
siphon with 300 ml of water.

Содержание Blauwe Engel S-HR 15

Страница 1: ...INSTALLATION SERVICING INSTRUCTIONS 8G 51 28 01 04 03 We reserve the right to make changes CE PIN 0063AS3538 These instructions to be retained by user...

Страница 2: ......

Страница 3: ...oiler and installation 17 10 1 Central heating system 17 10 2 Hot water supply 17 11 Commissioning the boiler 18 11 1 Central Heating system 18 11 2 Hot water supply 18 11 3 Adjustments 18 12 Isolatin...

Страница 4: ...bers of CORGI and in accordance with the current Gas Safety Regulation Failuretoinstallappliancecorrectlycouldlead to prosecution In addition to the above regulations this appliance must be installedi...

Страница 5: ...llationorthehotwatersupply Asaresultthe boiler will adjust its capacity to the installation and will switch on less often which means that the boiler will operatelongerandatalowlevel Itispossiblethatt...

Страница 6: ...m 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 J e p i p n r u t e r e d i s t f e l m m 5 8 2 5 8 2 5 8 2 5 8 2 5 8 2 5 4 4 5 4 4 5 4 4 K e p i p n o i t a s n e d n o c e d i s t f e l m m 0 7 3...

Страница 7: ...nated testing water can be released It is advisable to spray clean all of the unit s connectingpipesand ortospray clean blow clean the installation before connecting it to the unit connection diameter...

Страница 8: ...with the boiler The electrical side of this external circulation pump can be connected in the Control Tower by which means this pump switches at the same times as the boiler pump The maximum absorbed...

Страница 9: ...rtcylinder theexpansionvessel connectionisincludedintheinternalpipingoftheComfort cylinder towhichtheexpansionvesselcanbeconnected If a different cylinder is used then one has to take into account tha...

Страница 10: ...th S HR boiler figure 7 dimensions in mm 515 wall 145 370 front view of the expansion vessel module figure6 dimensions in mm 480 660 105 6 3 Underfloorheatingsystem plasticpipes Whenconnectingorusinga...

Страница 11: ...han 1 5 bar it is advisabletoremovetheinsidemechanismofthedosing valve Connectingofthedrinkingwaterinstallationshould be done according to the national water laws 6 6 Hot water supply S HR 15 24 and 3...

Страница 12: ...i l e h t o t d e d d a e b t s u m w o l e b d e t a t s h t g n e l t n e l a v i u q e s h t g n e l e p i p d n a m m 5 2 1 0 8 t c u d t s u a h x e s e r t e m 0 1 h t i w 4 2 R H S e l p m a x...

Страница 13: ...The flue must be terminated in a place not likely to cause a nuisance Forhorizontalsections theoutletsystemshouldalways be fitted on an incline 30 mm m sloping down towards the appliance so that no co...

Страница 14: ...be designed in accordance with the enclosed regulations Should it be necessary to change it the mains power supply cable may only be replaced with an ATAG mains power supply cable item No S4407300 The...

Страница 15: ...Installation instructions S HR series page 15 electrical connecting diagram figure 11...

Страница 16: ...emperatureovershoot Onacallforhotwater supply the T set value of central heating return water temperature is monitored Depending on the amount of sanitarywaterwhichiswithdrawnfromtheDHWcylinder the ce...

Страница 17: ...al lamps off Connect the filling hose to the cold water tap and let it fill with water Connect the filled filling hose to the filling and draining valve and open this valve Open the cold water tap and...

Страница 18: ...e boiler will start the burner 11 2 Hot water supply Provided there is a heat requirement from the cylinder the hot water program will be put into operation by means of the key hot water program 11 3...

Страница 19: ...rdatacanberetrieved user adjustment possibilities table 7 s t n e m t s u j d a r e t e m a r a p r e s U p e t S n o i t p i r c s e d y r o t c a f e g n a r 1 g n i t a e h l a r t n e c p m e t r...

Страница 20: ...i m 9 4 y t i c a p a c p m u p x a m g n i t a e h l a r t n e c 0 0 1 0 0 1 0 4 9 8 e c a f r e t n i g n i t t e s s s e r d d a 0 7 1 1 e r a p s 0 n i a r B 7 0 e d a c s a C n i 8 1 r e l i o b...

Страница 21: ...Good read out auto matically occurs after 20 minutes in the event that no more keys have been used installer service possibilities table 10 installer error possibilities table 11 r e l l a t s n i e...

Страница 22: ...the following operations must be carried out in order to enter the service chapter feed in the access code as described on pages 19 21 select the manual fan setting without burner action Step by means...

Страница 23: ...t can be corrected by means of the adjustment screw on the gas block 13 3 Checking the CO2 The CO2 percentage is factory set This can be checked by means of the following actions put the boiler into o...

Страница 24: ...unit the burner ceramic bricks and the heat exchanger can be cleaned by means of a soft brush Refitting of the components is done in reverse Thefollowingcomponentsrequireextraattentionduringthe servic...

Страница 25: ...e r r e w o p c i r t c e l e y b d n a t s W 5 5 5 5 5 5 5 5 9 2 5 0 6 N E o t g n i d r o c c a n o i t c e t o r p f o e e r g e d 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I t...

Страница 26: ...only S HR 24T and 35T E1 expansion vessel pipe only S HR 51T K coldwaterpipe S HR T W hotwaterpipe S HR T T1 flowsensor T2 returnsensor T3 cylindersensorHWS S HR T T5 flue gas sensor if fitted P1 wate...

Страница 27: ...burner bricks 9 cylinderHWS S HR T 10 operatingpanel boiler description figure 17 4 2 1 3 17 5 16 7 6 T3 9 18 T2 C 11 E1 K 13 14 15 W G 19 A 10 R T5 P1 T1 11 ControlTower 12 water filter return centr...

Страница 28: ...2 expansionvessel 3 outside sensor ARV1215U 4 drainpoints 5 ATAG room thermostat 17 Example diagrams for connecting the boiler 17 1 Radiator installation without thermostat valves connecting of the b...

Страница 29: ...xpansionvessel 3 outside sensor ARV1215U 4 drainpoints 5 ATAG room thermostat 6 by pass trv thermostaticradiatorvalve 17 2 radiator installation with thermostat valves only connecting of the boiler to...

Страница 30: ...apacity Block 60 Incorrect parameter setting of the minimum or maximum power Block 67 A T has been detected between flow and return sensor whereas the burner is not in operation After the T has disapp...

Страница 31: ...Installation instructions S HR series page 31 19 CE Certificate United Kingdom...

Страница 32: ...Installation instructions S HR series page 32 20 CE Certificate Ireland...

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ...This renewed publication cancels all previous installation instructions The company reserves the right to change the specifications and dimensions without prior notice E O E...

Страница 37: ...essure is to low 0 7 bar FILL indication remains continuously visible the boiler is taken out of operation The installation needs to be topped up Water pressure is to high 2 8 bar HIGH indication rema...

Отзывы: