background image

Installation instructions S-HR series page 30

18 Error indication

When detected, errors are indicated on the display. Some, of a temporary nature, will not usually result in the boiler
locking out. Whilst the control system will try its utmost to prevent lockout, and may temporarily switch off the unit,
any fault which could potentially damage the appliance will result in lockout. The following are examples of mes-
sage display, which fall into two categories - i.e. Blocks and Errors.

Blocks 

 with a number in the last 2 positions.

Block 01:

External safety contact cut out

Block 11:

Maximum 

'

T of flow and return sensor in central heating has repeatedly been exceeded. During the

block normal operation of the hot water supply is possible. The pump continues to operate at minimum
capacity during the block.

Block 12:

Maximum 

'

T of flow and return sensor in domestic hot water has repeatedly been exceeded. During

the block normal operation of the central heating installation is possible. During the block the pump
continues to operate at minimum capacity.

Block 60:

Incorrect parameter setting of the minimum or maximum power.

Block 67:

'

T has been detected between flow and return sensor whereas the burner is not in operation. After

the 

'

T has disappeared the block will disappear.

Block 80:

Maximum flue gas temperature has been exceeded (if present). The block will not be cancelled until
the flue gas temperature has arrived below the temperature.

Block 81:

The flue gas sensor is not connected although it has been connected to the control. The burner is

blocked

until the flue gas sensor is reconnected.

Block 82:

The flue gas sensor has short-circuited, heat requirement blocked and pump capacity at minimum.

Block 85:

The control has not detected a water flow. The venting cycle is started. If during this cycle water flow
is detected, the venting cycle is ended and the burner is released.

Error 

 with a number in the last two positions.

Error 00: poor flame-forming

Error 01: short-circuit of 24 volt circuit
Error 02: no flame-forming
Error 03: temperature in airbox to high
Error 04: adjustment or error for voltage interruption
Error 05: fault control unit
Error 12: fuse 24 volt/3AT faulty
Error 19: maximum return temperature exceeded
Error 28: number of revolutions not reported back from fan

Содержание Blauwe Engel S-HR 15

Страница 1: ...INSTALLATION SERVICING INSTRUCTIONS 8G 51 28 01 04 03 We reserve the right to make changes CE PIN 0063AS3538 These instructions to be retained by user...

Страница 2: ......

Страница 3: ...oiler and installation 17 10 1 Central heating system 17 10 2 Hot water supply 17 11 Commissioning the boiler 18 11 1 Central Heating system 18 11 2 Hot water supply 18 11 3 Adjustments 18 12 Isolatin...

Страница 4: ...bers of CORGI and in accordance with the current Gas Safety Regulation Failuretoinstallappliancecorrectlycouldlead to prosecution In addition to the above regulations this appliance must be installedi...

Страница 5: ...llationorthehotwatersupply Asaresultthe boiler will adjust its capacity to the installation and will switch on less often which means that the boiler will operatelongerandatalowlevel Itispossiblethatt...

Страница 6: ...m 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 5 8 1 J e p i p n r u t e r e d i s t f e l m m 5 8 2 5 8 2 5 8 2 5 8 2 5 8 2 5 4 4 5 4 4 5 4 4 K e p i p n o i t a s n e d n o c e d i s t f e l m m 0 7 3...

Страница 7: ...nated testing water can be released It is advisable to spray clean all of the unit s connectingpipesand ortospray clean blow clean the installation before connecting it to the unit connection diameter...

Страница 8: ...with the boiler The electrical side of this external circulation pump can be connected in the Control Tower by which means this pump switches at the same times as the boiler pump The maximum absorbed...

Страница 9: ...rtcylinder theexpansionvessel connectionisincludedintheinternalpipingoftheComfort cylinder towhichtheexpansionvesselcanbeconnected If a different cylinder is used then one has to take into account tha...

Страница 10: ...th S HR boiler figure 7 dimensions in mm 515 wall 145 370 front view of the expansion vessel module figure6 dimensions in mm 480 660 105 6 3 Underfloorheatingsystem plasticpipes Whenconnectingorusinga...

Страница 11: ...han 1 5 bar it is advisabletoremovetheinsidemechanismofthedosing valve Connectingofthedrinkingwaterinstallationshould be done according to the national water laws 6 6 Hot water supply S HR 15 24 and 3...

Страница 12: ...i l e h t o t d e d d a e b t s u m w o l e b d e t a t s h t g n e l t n e l a v i u q e s h t g n e l e p i p d n a m m 5 2 1 0 8 t c u d t s u a h x e s e r t e m 0 1 h t i w 4 2 R H S e l p m a x...

Страница 13: ...The flue must be terminated in a place not likely to cause a nuisance Forhorizontalsections theoutletsystemshouldalways be fitted on an incline 30 mm m sloping down towards the appliance so that no co...

Страница 14: ...be designed in accordance with the enclosed regulations Should it be necessary to change it the mains power supply cable may only be replaced with an ATAG mains power supply cable item No S4407300 The...

Страница 15: ...Installation instructions S HR series page 15 electrical connecting diagram figure 11...

Страница 16: ...emperatureovershoot Onacallforhotwater supply the T set value of central heating return water temperature is monitored Depending on the amount of sanitarywaterwhichiswithdrawnfromtheDHWcylinder the ce...

Страница 17: ...al lamps off Connect the filling hose to the cold water tap and let it fill with water Connect the filled filling hose to the filling and draining valve and open this valve Open the cold water tap and...

Страница 18: ...e boiler will start the burner 11 2 Hot water supply Provided there is a heat requirement from the cylinder the hot water program will be put into operation by means of the key hot water program 11 3...

Страница 19: ...rdatacanberetrieved user adjustment possibilities table 7 s t n e m t s u j d a r e t e m a r a p r e s U p e t S n o i t p i r c s e d y r o t c a f e g n a r 1 g n i t a e h l a r t n e c p m e t r...

Страница 20: ...i m 9 4 y t i c a p a c p m u p x a m g n i t a e h l a r t n e c 0 0 1 0 0 1 0 4 9 8 e c a f r e t n i g n i t t e s s s e r d d a 0 7 1 1 e r a p s 0 n i a r B 7 0 e d a c s a C n i 8 1 r e l i o b...

Страница 21: ...Good read out auto matically occurs after 20 minutes in the event that no more keys have been used installer service possibilities table 10 installer error possibilities table 11 r e l l a t s n i e...

Страница 22: ...the following operations must be carried out in order to enter the service chapter feed in the access code as described on pages 19 21 select the manual fan setting without burner action Step by means...

Страница 23: ...t can be corrected by means of the adjustment screw on the gas block 13 3 Checking the CO2 The CO2 percentage is factory set This can be checked by means of the following actions put the boiler into o...

Страница 24: ...unit the burner ceramic bricks and the heat exchanger can be cleaned by means of a soft brush Refitting of the components is done in reverse Thefollowingcomponentsrequireextraattentionduringthe servic...

Страница 25: ...e r r e w o p c i r t c e l e y b d n a t s W 5 5 5 5 5 5 5 5 9 2 5 0 6 N E o t g n i d r o c c a n o i t c e t o r p f o e e r g e d 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I 0 4 P I t...

Страница 26: ...only S HR 24T and 35T E1 expansion vessel pipe only S HR 51T K coldwaterpipe S HR T W hotwaterpipe S HR T T1 flowsensor T2 returnsensor T3 cylindersensorHWS S HR T T5 flue gas sensor if fitted P1 wate...

Страница 27: ...burner bricks 9 cylinderHWS S HR T 10 operatingpanel boiler description figure 17 4 2 1 3 17 5 16 7 6 T3 9 18 T2 C 11 E1 K 13 14 15 W G 19 A 10 R T5 P1 T1 11 ControlTower 12 water filter return centr...

Страница 28: ...2 expansionvessel 3 outside sensor ARV1215U 4 drainpoints 5 ATAG room thermostat 17 Example diagrams for connecting the boiler 17 1 Radiator installation without thermostat valves connecting of the b...

Страница 29: ...xpansionvessel 3 outside sensor ARV1215U 4 drainpoints 5 ATAG room thermostat 6 by pass trv thermostaticradiatorvalve 17 2 radiator installation with thermostat valves only connecting of the boiler to...

Страница 30: ...apacity Block 60 Incorrect parameter setting of the minimum or maximum power Block 67 A T has been detected between flow and return sensor whereas the burner is not in operation After the T has disapp...

Страница 31: ...Installation instructions S HR series page 31 19 CE Certificate United Kingdom...

Страница 32: ...Installation instructions S HR series page 32 20 CE Certificate Ireland...

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ...This renewed publication cancels all previous installation instructions The company reserves the right to change the specifications and dimensions without prior notice E O E...

Страница 37: ...essure is to low 0 7 bar FILL indication remains continuously visible the boiler is taken out of operation The installation needs to be topped up Water pressure is to high 2 8 bar HIGH indication rema...

Отзывы: