Installation instructions S-HR series page 18
11 Commissioning the boiler
Before the boiler is fired, ensure that the boiler and the
system are well vented and free of air. Purge the gas line
between the gas meter and the boiler and carry out a
gas soundness test as specified in the current Gas
Safety Regulations.
The boiler does not require adjustment of the burner
pressure and air quantity because it is self adjusting and
is factory set at the correct value.
11.1 Central Heating system
Provided there is a heat requirement from the
thermostat or control, the central heating program will
be put into operation by means of the
key (central
heating program). The circulation pump will start
circulating and the boiler will start the burner.
11.2 Hot water supply
Provided there is a heat requirement from the cylinder
the hot water program will be put into operation by
means of the
key (hot water program).
11.3 Adjustments
In the Control Tower a number of adjustments can be
made. These adjustments can be fed in easily by means
of the keys on the boiler. However, a distinction is made
between adjustments which are done by the user and
adjustments done by the installer.
At users level adjustments can only be made from the
technical read-out in other words from the display read-
out with the operating function and the water
temperature. Adjustments can not be made from the
indication.
The next two chapters are accessible after pressing the
Mode key:
Chapter 1
The normal operating functions such as the simple
read out or the technical
with the
read out.
Chapter 2
The chapter in which adjustments can be made.
Содержание Blauwe Engel S-HR 15
Страница 2: ......
Страница 15: ...Installation instructions S HR series page 15 electrical connecting diagram figure 11...
Страница 31: ...Installation instructions S HR series page 31 19 CE Certificate United Kingdom...
Страница 32: ...Installation instructions S HR series page 32 20 CE Certificate Ireland...
Страница 33: ......
Страница 34: ......
Страница 35: ......