10
© 2021 United States Stove Company
2. Taking into account the minimum clearances
mentioned in table two, locate the closest wall
stud (which will serve to hold the appliance) and
mark the square hole center at a distance “A”, (if
wall stud is at the right), or “B”, (if the stud is at
the left)(see table 2 and Figures 7 and 8). Note:
Use the heat shield to help hold the bracket in
place when marking the square hole locations.
TABLE 2
A
B
C
D
DVAG11N / DVAG11L
9-1/8”
(233 mm)
6-13/16”
(174 mm)
20-3/16”
(514 mm)
11-1/4” X 11-1/4”
(286 x 286
mm) square
hole
DVAG17 / DVAG17L
8”
(204 mm)
8”
(204 mm)
19-1/2”
(495 mm)
11-1/4” X 11-1/4”
(286 x 286
mm) square
hole
DVAG30N / DVAG30L
8”
(204 mm)
8”
(204 mm)
23-3/16”
(590 mm)
11-1/4” X 11-1/4”
(286 x 286
mm) square
hole
3. Draw the position of the square hole for the
vent-air intake pipe (see dimensions for square
hole “D” and the height to the center “C” in
table 2 for the different models. Height “C” is the
minimum recommended.
4. Cut the square hole through the wall according
to the measurements and positions indicated in
figure 7 and 8.
C
FLOOR
D
D
A
Figure 7
C
FLOOR
D
D
B
Figure 8
5. Insert the two provided rubber grommets (v)
into the lower bracket as shown.
v
X 2
6. Place the wall bracket with the heat shield
attached into the square hole. Check to see
that the bracket is level. If not, you may have to
trim the hole you cut to ensure the bracket is
level when installed. After leveling the hanging
bracket, mark the 4 holes as shown.
FLOOR
INSTALLATION