laserBIRD™ Installation and Operation Guide
70
70
70
70
!
Tip:
For
assistance with the
'Reference Frame'
settings, check out
the
in
Chapter 3.
REFERENCE FRAME
ASCII HEX DECIMAL BINARY
Command Byte r 72 114 01110010
Command Data A, E, R
By default, The Bird's reference frame is defined by the Scanner's physical X, Y, and Z axes
.(see
Figure 3.1)
In some applications, it may be desirable to have the orientation measured with respect
to another reference frame. The REFERENCE FRAME command permits you to define a new
reference frame by inputting the angles required to align the physical axes of the Scanner to the X,
Y, and Z axes of the new reference frame. The alignment angles are defined as rotations about
the Z, Y, and X axes of the Scanner. These angles are called the, Azimuth, Elevation, and Roll
angles.
The command sequence consists of a Command Byte and 6 Command Data bytes. The
Command Data consists of the alignment angles Azimuth (A), Elevation (E), and Roll (R).
If you immediately follow the REFERENCE FRAME command with a POINT or STREAM mode
data request you may not see the effect of this command in the data returned. It may take one
measurement period before you see the effect of the command.
The Command Byte and Command Data must be transmitted to The Bird in the following seven-
byte format:
MSB LSB
7 6 5 4 3 2 1 0 BYTE #
0 1 1 1 0 0 1 0 #1 Command Byte
B7 B6 B5 B4 B3 B2 B1 B0 #2 LSbyte A
B15 B14 B13 B12 B11 B10 B9 B8 #3 MSbyte A
B7 B6 B5 B4 B3 B2 B1 B0 #4 LSbyte E
B15 B14 B13 B12 B11 B10 B9 B8 #5 MSbyte E
B7 B6 B5 B4 B3 B2 B1 B0 #6 LSbyte R
B15 B14 B13 B12 B11 B10 B9 B8 #7 MSbyte R
See the ANGLES command for the format and scaling of the angle values sent.
Содержание laserBIRD
Страница 3: ......
Страница 5: ......
Страница 7: ......
Страница 11: ......
Страница 21: ......
Страница 32: ...3 Configuration and Basic Operation 25 25 25 25 Figure 3 3 Sensor Mounting Dimensions inches...
Страница 42: ...3 Configuration and Basic Operation 35 35 35 35 Figure 3 6 Horizontal Field of View...
Страница 43: ...laserBIRD Installation and Operation Guide 36 36 36 36 Figure 3 7 Vertical Field of View...
Страница 45: ......
Страница 70: ...4 Software Operation Tools for Successful Tracking 63 63 63 63 Figure 4 1 Using the OFFSET command...