EN
AS Strömungstechnik GmbH
www.asstroemungstechnik.de
Version date: 09/2020
40
9 Maintenance/disposal
9.1 Cleaning the fill head
•
After disassembly, the liquid channel
of the fill head must be flushed with
ultra pure water or a suitable flushing
medium.
•
In the case of hardening, adhesive
and clumping chemicals, we recom-
mend flushing the entire delivery line
with ultra pure water or a suitable
flushing medium after each use.
•
If necessary, wash the fill head from
the outside with ultra pure water or a
suitable rinsing medium.
9.2 Fill head maintenance
The following checks must be carried out
regularly, at least monthly, in addition to the
checks during assembly:
Component
Testing
Fill head
Check regularly for discol-
oration and damage.
Check valve
Regular functionality
check
O-rings on the
fill head
Regularly check for wear
and tear and replace if
necessary.
Electrical con-
ductivity
For CD version, check
conductivity regularly
(may change due to expo-
sure to chemicals).
O-ring on
check valve
Regularly check whether
the check valve seals
completely.
Tap/ball valve /
shut-off valve
Regular function check.
Fill head
Regularly check the con-
nections for proper screw
connections.
Overfilling
sensor
Regular function check.
Maintenance/disposal
Содержание DH -N2 Series
Страница 1: ...Operating instructions Translation Fill heads of the series QC2 G Series ...
Страница 42: ......
Страница 43: ......
Страница 44: ......