EN
AS Strömungstechnik GmbH
www.asstroemungstechnik.de
Version date: 09/2020
33
12. Screw on the fill head with the tight-
ening nut (7) using the torque tool
(8) (see Section 3.1) with the correct
torque.
•
QC2: 2.6 Nm
•
G-Series: 2.6 Nm
13. Check that the fill head is
completely and correctly mounted.
This means that the fill head must e.g.
not be inserted at an angle.
»
Check whether further precautions
must be taken to ensure this, e.g. by
using a fill head with limit switch or by
using a light barrier.
14. Press the anti-rotation clip (9) down-
wards.
Assembly/commissioning
»
The tightening nut can only be moved
within the two lugs of the code disk
between which the anti-rotation clip is
located.
15. Check again that the head is correctly
inserted and tightened.
WARNING
Hazard from chemicals!
If the head is not completely screwed
on, vapors or chemicals can escape via
the dip tube and fill head connection
and not through the dedicated vent and
liquid ports.
16. Check from all sides that the code disk
lies flat on the dip tube (10).
Содержание DH -N2 Series
Страница 1: ...Operating instructions Translation Fill heads of the series QC2 G Series ...
Страница 42: ......
Страница 43: ......
Страница 44: ......